supretendent mechanical
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 20 years
Relocation: Yes - Domestically
Career Objective
fabrication and erection of structural steel and instalation of heavy equepments.
Professional Experience
1. SAUDI BINLADIN GROUP-PCM-DI V. JUBAIL, KSA
Sep 2006 To date
Position : Construction Superintendent
Client : Fluor Arabia
Owner : Yansab ,Yanbu
Job : Installation of Heavy Equipments, Cooling Water Pumps and Plate
Exchangers, Fabrication and Erection of structure steel up to
30000tons.
July 2004 to Aug 2006
Position : Project Supervisor
Client : SAPL (Parson Arabia)
Owner : Royal Commission, Yanbu
Job : Fabrication and Erection of structure steel and installation of rotary
Equipments.
May 2004 to July 2004
Position : Project Supervisor
Client : ABB LUMUS
Owner : Yanbu Petrochemical Company (Yanpet)
Job : Fabrication and Erection of Structure steel
May 2003 to May 2004
Position : Field Supervisor
Client : Flour Arabia Limited
Owner : Jubail United Petrochemical Complex
Job : Fabrication Erection and Modification of Structure steel
Oct 2002 to May 2003
Position : Field Supervisor
Client : Saudi Aramco
Project : Rabigh Refinery
Job : Retubing and modification of boilers of 100t/h capacity.
Mar 2002 to Oct 2002
Position : Mechanical Supervisor
Client : Simon Carves
Project : Cristal
Job : Fabrication and Erection of Structure and CS pipeline
Jul 2001 to Mar 2002
Position : Fabrication Supervisor
Project : Luberef II
Job : Design, Fabrication and Erection of Structure steel and Pipe
Supports for CS pipeline
Apr 2000 to Jan 2001
Position : Fabrication Supervisor
Client : Parson Arabia/Descon
Project : IBN-ZAHR
Job : Fabrication/Erection of Structure steel and CS pipeline
Nov 1998 to Feb 2000
Position : Project Supervisor
Client : Parson Arabia/Descon
Project : Petrokemya
Job : Fabrication / Erection of Structure steel and CS pipeline
2. THAL INDUSTRIAL COORPORATION PUNJAB (PAKISTAN)
Dec 1995 to Oct 1998
Position : Assistant Boiler Engineer
Client : Leyyah Sugar Mills
Job : Incharge Boiler Operation, Modification and Maintenance Work
Related to boiler house
Mar 1994 to Dec 1995
Position : Boiler Foreman
Client : Leyyah Sugar Mills
Job : Upgrading and Retubing of three boilers design by Jhon Thamson
3. HEAVY MECHANICAL COMPLEX, TEXILA (PAKISTAN)
Eductation
Education Matric with Technical Science year 1977
Academic Diploma of Associate Engineer in Mechanical Technology
year 1980
Qualified III class Boiler Engineer year 1984
Certification
Jul 1992 to Mar 1994
Position : Deputy Foreman
Client : Takuma Engineering Company, Japan
Job : Section Incharge Fabrication of Power Boilers for Port Bin Qasim
Power Plant
Jan 1990 to Dec 1992
Position : Assistant Foreman
Client : Babcock Engineering Company
Job : Section Incharge Fabrication of Power Boilers for Port Bin Qasim
Power Plant
Apr 1985 to Jan 1999
Position : Fabrication Supervisor
Job : Fabrication of different cement and sugar plants (Facto Cement,
Parkland & Cherat Cement, Fuji Sugar Mills. Fazal Sugar Mills and different type of Road Rollers, Asphalt Plant, LPG tanks, Pipeline for Dakhani Oil Field
May 1980 to Apr 1985
Position : Charge hand
Job : Section incharge for boiler section of Fabrication and assembling
Of different type of water tube and fire tube boilers up to 100ton/hr
Additional Information
A BRIEF DESCRIPTION OF EXPERIENCE
„« Fabrication Erection and modification of structure steel up to 6000 Tons.
„« Erection of Cooling water pumps and Plate exchangers.
„« Completed a wide verity of work assignments including piping system, steel structure, designing and manufacturing of lifting devices for heavy equipments, tanks, maintenance activities, quality, safety, planning & material handling system and manufacturing of high pressure vessels.
„« Piping fabrication & erection of boiler area, demon plant under and above ground process area.
„« Test package and hydro testing of piping.
„« To carry out maintenance during shutdown of pressure vessels, heat exchanger, columns, fin fan coolers, valves refurbishment & services.
„« Pipe joining operation, welding of pipe length, pipe end preparation stringing, swabbing, remove foreing material, lining up and positioning of pipe line.
„« Fabrication and erection of pipe support.
„« Fabrication and erection of steel structure above 58000 tons.
„« Fabrication and erection of plate form, ladders and hand railing for equipments.
„« Erection, alignment, inspection of rotating equipments.
„« Fabrication, erection, hydro testing, sandblasting and painting of different types of tanks.
„« To prepare scheduling, monitoring, invoicing & prepare comparatives details back up sheets, weekly, monthly schedule at all levels.
„« To develop detail schedule based on client requirements.
Hot Categories
Chemicals
Batteries