piping engineer
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 8 years
Relocation: Yes - Internationally
Career Objective
Result oriented, proactive and hard working professional with a BE degree (Bachelor of Engineering – Mechanical) and more than 7 years of achievement driven experience in end to end process and construction industry
Professional Experience
Responsible for the integrity of the facilities layout, mechanical & piping, conceptual / detailed design work including quality, Health, Safety & Environment (HSE) aspect and within cost and schedule.
Planning to optimize the FAB shops (SS, CS and Alloy pipe Fabrication shops) to produce maximum calculated production.
Reporting to Construction Manager for all activities and making co-ordination amongst other disciplines to expedite the construction.
Material controlling and coordinating with client(KBR) by the use of 3D modeling - Navis Jet stream and VBC 2005
Working Independently on preparation of data sheets, specification, Material Requisitions, Technical Bid Evaluation, etc
Interacting with the other disciplines such as Clients and Vendors.
Provide assistance (and occasionally responsible) to Team Leader for the coordination of HSE related aspects such as coordination of HSE related studies (Quantitative Risk Assessment, Plant Layout Optimization, Equipment criticality assessment, Noise mapping, and Ergonomics) and project related reviews and audits.
Eductation
BE degree - Bachelor of Engineering – Mechanical, from MK University(April1996 to April2000)
Certification
Gained proficiency in MS-Office, Windows and AutoCAD packages
Certified safety person by HSSE,P.GTL
Holder of Indian Light Moving Vehicle License.
Additional Information
Erection, commissioning, trouble shooting and servicing works corresponding to Mechanical Maintenance and reporting to Engineering Manager for following static rotary equipments such as blowers, exhaust fans, pumps(centrifugal) conveyors, wet ball mills, agitators, Crushers, Air Compressors (Atlas Copco) and some ceramic machineries such as Spray driers, Vertical driers, Hydraulic presses, Roller kilns
Fabricating the spare parts such as shafts, pulleys etc., by generating fabrication drawings (AutoCAD).
Planning and inspection of all machineries and organizing various maintenance activities as per schedule as well control all ongoing preventive, periodic, predictive and corrective maintenance tasks.
Supervising the maintenance activities of utility (GAS, AIR, Industrial & Portable WATER pipelines and De- dusting ducts).
Directs the implementations and modifications, which helps to reduce the down time of plant and Co-ordinates respectively with production and quality control departments to increase productivity and improve quality.
Involving new 40K project plant erection works (for 40000sqm porcelain body) with ITALIAN technicians including utilities pipelines (water, gas and air).
Planning and monitoring of spares availabilities by creating purchase requests by means of technical evaluations, reviews and approvals of suppliers' submittals (by BAAN VI - SSA global).
Worked in the environment of electro-mechanical machineries with hydraulic and pneumatic systems
Hot Categories
Chemicals
Batteries