projects engineer
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 2
Experience: 5 years
Relocation: Yes - Internationally
Industry Experience |
5 years |
|
Engineer |
0 years |
|
|
Career Objective
Seeking a position in mechanical engineering in an Oil company; projects engineer
Professional Experience
Professional experience @ GUPCO:
- Project integrity and facility Engineer :
„X- Plan, coordinate and execute major planned shutdowns (S/D) for maintenance and integrity repairs inside offshore P/F's and onshore locations :
- responsible for controlling and organize scaffolding activities for all offshore P/F's taking into considerations scaffolds standards for erection and GUPCO / BP safety management system concerning working at heights.
- Responsible for supervise, coordinate and control our contractors companies' working activities to be restricted to scheduled activities. Review contractors companies safety management system and adjust it with our company safety management system to ensure a safe working environment
- Prepare our division budget for every new year including all new projects, materials, labors, tools and equipments required for executing our planned projects and maintenance activities.
ex. - Install 12" Jumper to Utilize 10" C.O.P's to be Test HDR. @ J#10 P/F
- Replace 18" Scale Portion, Install New 12" Jumper and Remove the Old Heat Exchanger with its Related Piping @ Badri#C P/F
- Convert 12" HPG fm M#1 to Badri#C to be W.I.L @ Badri#C P/F
- Mech. Repair, Sandblasting and Painting for SEP. 501A&501B ;and Replace their 3"&4" Drain Line Valves @ Sh/Ali P/F
- Replace F.F Sys. @ Sh/Ali P/F
- Replace 16"X6" Outlet of De-Arator @ Sh/Ali P/F
- Replace 2" Blow Down Line & 8" HDR. @ Sh/Ali P/F
- Replace 12"x16" Outlets of SEP. 30&40 @M#36 P/F
- Replace 8" Oil Line fm M#124 to M#55 @ M#8 P/F plus Restore Oil Potential fm M#124 to M#8 @ M#55 P/F
- Install New 12"X18" HDR. @ GS-327 P/F
- Helidecks Marking & Wells Fixation for All Offshore P/F's
- Install New 18" Oil Trunk Line fm Onshore J.J to Process
- Replace 30" HPF & 30" Slug Catcher P/L @ Process
- Replace 24" Oil Line of T 311&314 @Tank Farm Area
- Mechanical Repair for Skim Tank 9800&9801 @ Ballast
- Install New Potable Water Tank 701 @ Process
- Replace 24" Inlet Line to Hemis 3100 @ Process
Eductation
B.Sc. of Mech. Power Eng., May 2002, Faculty of Engineering, Menoufia University