petroleum engineer, reservoir engineer, drilling engineer, production engineer.
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 0 years
Relocation: Yes - Internationally
Career Objective
To join a dynamic and progressive organization offering ample opportunities for fresh graduates to become professional.
Professional Experience
internship and industrial visits:
• 8 weeks tour to OGDCL fields (Fimkassar, Chaknaurang and Kal oil field).
• 1- week of stay with sprint-oilfield services at OGDCL field.
• 1-day workshop with CNLC (Islamabad).
Eductation
UET – LAHORE, PAKISTAN.
Bs Petroleum & Gas Engineering (04-08)
Final Aggregate: 75.45 % (A)
GC – MULTAN
Fellow of Science (Pre-Engineering) (2002-2004)
Obtained Percentage: 80 % (A+).
ZPS – Multan
Matriculation (2000-2002).
Obtained Percentage: 82.83 % (A+)
Certification
• Awarded by the Multan Board scholarship in SSC examination.
• Active member of SPE.
• Participated in GIKI Science Fair (2008).
• Participated in U.E.T MASTER MIND Quiz competition (2006).
• 2nd Prize in Inter-College Essay writing competition at Nishtar Medical College, Multan (2004).
Additional Information
Let me introduce myself through this letter. I’ve recently graduated from University of Engineering and Technology established in Lahore, PAKISTAN as a Petroleum and Gas Engineer. I used to be very organized. Because of a good maturity level, I've good approach towards professional life. The very key aspect is my very strong belief in self-motivation.
Throughout my bachelors, I've studied various subjects which are mainly associated with the study different drilling techniques and how to handle drilling operations while using these techniques. The bachelor study also enabled me to get familiar with different type of reservoirs, the most appropriate approach of phase diagrams to distinguish them, the techniques pertinent to control these reservoirs during drilling and production. The study also includes various injection techniques to enhance the production from the existing reservoirs.
I had a final year project with the name of casing design theory and practice. I’ve learned the running of casing with certain depth, installation of liners, casing to be used under high or low pressures, cementing job after running each casing, collapse of casing, burst of casing, tension in the casing strings, etc. We all project-mates also developed software relevant to our final year project which can solve lengthy calculations with a single click.
Hot Categories
Chemicals
Batteries