Instrumentation Technician
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 3
Experience: 18 years
Relocation: Yes - Internationally
Career Objective
Seeking a position in a progressive and forward looking organization that I can take advantage of my sound basic qualification and provide me good opportunity to learn, grow & gain practical experience in a dynamic & challenging work environment.
Professional Experience
PRESENT
(Oil & Gas Development Company Limited)
Working as instrument Technician BPS-13 (Equal to supervisor) since 25thsep 1995
( Qadir pur gas Field OGDCL 25th sep: 1995 to oct: 1999)
Worked as instrument Technician at Qadir pur gas Field during tenure I worked on Nouovopignone Turbine PGT-10, Suvimic II turbine control DCS system, Bentley Nevada Vibration system and Carlo Gavazi Relay logic ESD system.
KUNNAR LPG PLANT & CONDENSATE FIELD OGDCL
Presently working at kunnar LPG plant & condensate field since 1999.During this period I am working on Murphymatic electronic controller 500 series engine ignition control; Microguard selectronic control for engine drive compressor.
PAST
HUBCO POWER PROJUCT (APRIL 1995 TO AUGUST 1995)
Worked with Zelin PVT Limited as Instrument Technician during this period I worked on installation & calibration Loop checking of Demin: plant, Desalination, Auxiliary Boiler.
WESCON INTERNATIONAL BV ,(UAE) (SEP 1992 TO AUG 1994)
Worked with Wescon, international BV ABU DHABI UAE as Instrument Technician during the period I worked on following project.
UMMUAL NAR REFINERY EXPANSION II PROJECT:(SEP 1992 TO JAN1993)
Worked as instrument technician at the project of Ummual Nar refinery expansion II project during this period worked on installation of HONYWELL TDC 3000 DCS system
GASCO (FEB1993 TO MARCH 1993)
Worked as instrument Technician at Gasco Bu Hassa ATA Shutdown during the period I worked on calibration of control valves, Transmitter.
ADCO WATER INJECTION IN POWER PROJECT (MAR 1993 to July 1994)
Worked on upgrading of 28 No of clusters, the work involve calibration, installation loop checking of instrument / Toshiba PLC logic, RTU System for monitoring the parameters of clusters & injection well.
PROCON PVT LIMITED (MAR 1988 TO SEP 1992)
Worked with Procon pvt Limited as Instrument Technician at the project of union Taxas Oil & gas field Bukhari gas Field, Mazari oil Field
Golarchi, gas field, Nari gas Facility Matli gas Field, Dhabi gas Field
Eductation
Passed Bsc (pass) pre engineering from university of Sindh
Passed HSC II Pre Engineering from BISE Hyderabad
TECHNICAL QUALIFICATION:
Passed 2 year course in the trade of instrument Technician from metallurgical Training center Pakistan steel mills corporation Bin Qasim Karachi.
Hot Categories
Chemicals
Batteries