Automation & Control Engineer
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 11 years
Relocation: No
Career Objective
As Process Automation and Control Specialist i can be responsible for analysis and design of ESD logic Process control, Design Scope Writing, Multiple Projects Management, Conducting review meetings, acceptance tests, and commissioning, ...
Professional Experience
Work Experience:
March 2008+
Control Systems Design at Berri Gas Plant Department/Engineering Division/Projects Support Unit (Saudi Aramco).
Major Responsibilities:
• Design Scope Writing
• Multiple Projects Management
• Conducting review meetings, acceptance tests, and commissioning
• Verifying Standards Compliance in Design
• ESD logic / Process control design & Analysis
September 98 – February 2008
DCS Engineer at Berri Gas Plant Department/Engineering Division/Specialist Unit (Saudi Aramco).
Major Responsibilities:
• Honeywell system configurations and implementations
• Triconex system configurations and implementations
• ESD logic design and analysis
• Process Control design, analysis, and tuning
• Systems experience: Honeywell DCS, Triconex, Wonderware MMI, PI, and Mitsubishi Diasys Netamtion
PROJECTS PARTICIPATION:
• BI-3167 : Additional Sulfur Handling/Export Facilities
• BI-3150 : Ethane Recovery Plant
• BI-3182 : Cogeneration Plant
• BI-10-0054 : Tricon PLC Systems Upgrade
• BI-10-0188 : ESD System Upgrade for Sulfur Recovery Units
March 98 - September 98
Process Control Technician at Berri Gas Plant Department/Maintenance Division/IED Unit (Saudi Aramco).
Major Assignments:
• Installation and calibration of temperature, pressure and flow measuring devices
• Connections of measuring devices to I/O modules in Honeywell system
• PM checks and calibrations of valves
• Troubleshooting of compressors local controllers
Summer-1998
Industrial Engineer at O&IE Department/Industrial Engineering Division (Saudi Aramco).
Major Assignment:
• Manpower study of AIN DAR Producing Maintenance Division. The study objectives were to:
1.Review the existing workload and determine the most efficient manpower for each unit
2.Review and analyze the existing grade code mix
3.Search for areas of improvement and safety measures
Eductation
Education :
August 1997, Bachelor Degree of Science in Systems Engineering (Automation & Control) with Honors from King Fahad University of Petroleum and Minerals (K.F.U.P.M.).
Hot Categories
Chemicals
Batteries