Electrical Engineer
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 3
Experience: 10 years
Relocation: Yes - Internationally
Career Objective
As evident from the detail contained in my CV I have the ability to adapt to a wide range of Situations and have an outside interest in the type of work I am seeking.
Professional Experience
Company DADABHOY ENERGY SUPPLY CO. LTD
Designation As a Sr. Deputy Manager (PLC Automation)
Period Dec 20, 2005 to till
Reporting Reports to Chairman, Managing Director, Deputy Managing Director &
GM – Works.
Description To work on PLC System. Complete installation of PLC of the entire Plant.
Responsible for smooth, safe operation, maintenance and calibration of field instruments.
All kind of Electrical & Electronics installation, commissioning, maintenance, repair,
solution provider & calibration in coordination with the team. To control, program maintain
repair and modify the software and hardware of the distributed control System (DCS/PLC) personal Computers, all the instrumentation equipment Exploration of new and efficient alternatives for the old instruments, modifications and design amendments. Maintaining
minimum stock of instruments. (Resource Management).Any other duty assigned by the
Executive Management.
Company SPEEDY AUTOMATION (Industrial Process Control Equipment)
Designation As a Sr. PLC Engineer
Period 08-04-2003 to 2005
Description My responsibility here Commissioning , Installation to ( Industrial Process Control Equipment )
Provide the different Companies as pre requirement I represent Aucom Soft Starter,
Vacon AC Drives, Endress Hausser, GE Fanuc PLCs, and done many other PLCs and
Process Automation Projects Behalf of Speedy Automation.
Project That I Performed
• I had installed and commissioned M-system Based Paper less Monitoring
and recording System in KESC (BQPS)for Boiler and Turbine of CCR 3.
• At Kapco Power Company (Kot Add) I had installed PLC Bsed Data
acquisition system, With Cimplicity HMI on CCR 1. After 6 Mothers of
installation the Same System is also installed in CCR 2.
HMI unit separately.
Company Siemens Pakistan Engineering Co. Ltd
Designation as PLC Automation Engineer (MES Department)
Period 18-01-2000 to 07-04-2003
Description My responsibility here Commissioning / Erection and Installation of different Industries PLC Automation
Eductation
1999-2002 B.Tech (Hons) in Electrical.
1st Division from Government Collage Technology affiliated with NED University
1994-1997 Diploma of Associate Engineer (DAE) in Electronics
1st Division from Government Jamia Millia Polytechnic Institute, Karachi.
1990-1992 Matric in Science Group.
2nd Division from Board of Secondary Education Karachi
Hot Categories
Chemicals
Batteries