plant/process/field/utilities operator
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 2
Experience: 2 years
Relocation: Yes - Internationally
Industry Experience |
1 years |
|
Other |
Career Objective
Want to associate my Technical Skills with an oil and Gas Company in the capacity of PROCESS /UTILITIES OPERATOR.
Professional Experience
Responsible for the status monitoring of the following:
Poly Reactor Status: Zero Hour, Recovery time ( starting recovery time and end of recovery), stage of recovery, pressure reading (main and secondary), temperature status, reactor tags and padlocks at man way, bottom valves, manual venting valves, leakage check-up (all inlet and outlet valves), mercoid switch alarm and sensors (thermocouple and thermoils)
Blend Tank Status: Product type, slurry level, slurry transfer status, agitator’s status (driving motor and agitator’s running condition)
Entrainment Separators: Status, Content, filling water used (filtered fiber water), seal water level, Vacuum condition, valve alignments, and leakages check-up
Vent Condenser: Pressure, Temperature, Manual Venting, Valves status (leak-free), pneumatic valves and air supply, sensors effectivity
Vilter Unit: Chilled/Cooling Water pressure and temperature, suction and discharge pressure/temperature, oil pressure, driving motor and unit’s running condition.
Pump Status: Vacuum pump (east/west), oil pump, Cold DM pump (east/west), Hot DM pump (east/west), Seal Booster pump (east/west), RVCM pump (east/west), FVCM pump (east/west), slurry transfer pump (from reactor and entrainment separators), BT-BT slurry transfer pump, check oil bottle levels, suction and discharge pressure, water supply for mechanical seal, cooling water, running condition (abnormalities, unusual sound, leakages fan obstruction)
Specific Assignments:
• Monitored the Vilter Unit and Vent condenser
• Prepared Shortstop solution
• Prepared Caustic Soda solution
• Prepared Polystat solution
• Prepared Entrainment Separators for Recovery of unreacted VCM
• Prepared Recovery system
• Performed Recovery operation
• Prepared chemicals for production
• Prepared and cleaned reactor prior to charging
• Prepared and cleaned Blend tanks for change of products
• Checked valve alignments prior to recovery
• Checked valve alignments prior to slurry transfer
• Checked valves, lines, reactors, pumps and tanks leakages
• Checked clogs on valves and de-clogged
• Took samples of product, water from RMT for laboratory analysis
• Assisted Poly Lead Operator
Eductation
EDUCATIONAL BACKGROUND
2003 ~ 2007 COLLEGE Mindanao State University - Iligan Institute of Technology
Diploma in Electrical Engineering Technology
Iligan City, Misamis Oriental, Philippines
1999 ~ 2003 SECONDARY Immaculate Conception High School
Secondary Diploma
Pitogo, Zamboanga del Sur, Philippines
1993 ~ 1999 Primary Pitogo Central Elementary School
Elementary Diploma
Pitogo, Zamboanga del Sur, Philippines
Hot Categories
Chemicals
Batteries