Egypt Zones accountACCOUNT

Senior Material Controller


This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription. Go to Recruitment Products >>
Education: 3
Experience: 6 years
Relocation: Yes - Internationally

Industry Experience
6 years Other

Career Objective

To be able to explore my skills and potentials that will contribute in the success of the organization.

Professional Experience

Broad involvement with such Materials/Stock Control, Warehouse/ Store Management, Materials expediting/ inspection, Logistic Functions/ Computer Operator.

May 6,2007 – Present
Material Controller
Material Control Section
Petro Rabigh Development Project /ARAMCO Main Contractor JGC Arabia Ltd (Japan Gas Corporation) Petro Rabigh Olefin Plants Project
Rabigh, Kingdom of Saudi Arabia



1. Person-In-Charge for all the Two Years Operational Spare Parts materials. Receiving and checking of all two years operational spare parts for Piping, Equipment, Instrument and Electrical materials. Prepare Receiving Inspection Request (RIR) for QC Inspector. Prepare Material Exception Report if found any damage on material or if there is any discrepancy between the packing list and the material received and submit to (Client) Petro Rabigh for final approval. Person in-charge for the storage location and documentation of all the received two years operational spare parts.

3. Receiving the materials, checking against the shipping documents and the Purchase Order, initiating the Material Receiving Report relevant documentation, performed material shortage, and Damage Report. requisition and issuing.


4. Assign at Steel Structure materials for receiving and issuance. Receiving of materials from the shipment and immediately check if there is any discrepancy from the packing list.
July 04, 2001- January 2007
Material Controller
NLNG/N-Plus Project (Train 5)
NLNG Six Project (Train 6)
Daewoo Nigeria Ltd.
Bonny Island Nigeria



2. To request the materials from the workplan according to the priority area of the project.

3. Responsible for the collection of workplan,tools and consumable materials to be use for fabrication and erection.
4. Responsible for the storage, safekeeping and proper arrangement of materials, tools and construction equipment.
5.Prepare a material stock inventory and other report and record requirement prescribed and submitted to material manager.

Eductation

Primary : Pateros Catholic School 1981-1987
Secondary : Pateros Catholic School 1987-1991
College : AMA Computer Learning Center
1993-1995

Hot Categories

Chemicals Batteries

Are you Hiring?


Reach the right candidates to fill your technical positions with Gulfoilandgas Jobs »
Technical Recruitment
Our Career Center has 70,000+ resumes for employers to search »
Associations » News » Event Organizers » News » Freight Forwarding » News » Professional Services » News » Recruitment » News » Sourcing & Procurement » News »
Engineer
Mechanical Engineer
Field Engineer
Quality Control/Quality Assurance Engineer
Environmental Health & Safety Associate
Engineering
Technician
Electrical Engineer
Engineering
Petroleum

Field Service Technician
Manager
Information Systems/Technology
Electrical/Mechanical/Structural
Construction Engineer
Civil Engineer
Assistant Manager
Purchasing Management
Chemical Engineer
Project Engineer
Analyst
Engineering
Drilling

Customer Service
Process Engineer
Control Engineer
Project Manager
Electrician
Computer Systems Analyst
Engineering Management
Operations Manager
Specialist
Marketing/Sales Manager
Sales
Construction Technician
Mechanic
Plant Engineer
Driller
Consulting Engineer
Maintenance Manager
Other
Egypt Zones
Copyright © Universal Solutions All rights reserved. - Privacy Policy.