Experience in design of onshore and offshore oil and gas projects in Iran, Malaysia and Australia. Specific experiences are in fields of Refinery and on shore project designs for Caltex, NIOC,Hyundai – ADMA , Petronas
Professional Experience
2007-208 PROCESS ENGINEER – Uhde Shedden Company (Melbourne, Australia)
•Process engineer for Sulphur Recovery Unit (SRU) project. Design and calculations of PSV, line sizing, pumps, vessel, sump, control valve. Preparation of PSV, pumps, vessel, control valve datasheets. Preparation Hazardous Area classification, battery limit, and line list tables. Simulation and calculation of flare network with Flare Net software
2006-2007 PROCESS ENGINEER – Ranhill-Worley Parsons Company (Kuala Lumpur, Malaysia)
•Process engineer for Umm Shaif Gas injection facilities project (Collector Separator Platform). Off shore project, design of new platform and supervision of junior engineers’ calculations such as Line Sizing and Line List. Hydraulic calculation for control valve sizing with Hysys software. Calculation of PSV sizing. Preparation of Motorizing operating Valve (MOV), Regulator, Emergency shutdown and control valve datasheets according to BP codex. Preparation of P&ID for drainage system (Open & closed drain). Preparation of PFD and Heat and Material Balance Table
•Process engineer for BOKOR platform Phase II. Reviewing FEED documents. Sizing of line, control valves, vessels according to DEP Shell utilizing Hysys software. Calculation of vessel and PSV sizing.
2003-2006 PROCESS ENGINEER – OIL DESIGN & CONSTRUCTION COMPANY (OD&CC)
•Process engineer for Bandar Abbas Gas condensate Refinery Project. It was Conceptual design and FEED Project. In conceptual design stage, Simulation of refineries’ units and adjusting heat exchanger positions for refineries according to the Pinch technology utilizing Hextran and ProII software.
In FEED stage: Preparing PFD and P&ID for Offsite unit. Sizing of P&IDs equipment such as Tank sizing, spherical, fixed and floating roof, line sizing, pump sizing, control valve and PSV. Preparation of datasheets for all equipment and instruments.
•Process engineer for Bandar Abbas Refinery Debottlecking Project. Reviewing FEED documents, sizing of equipments such as lines, vessels and pumps. Calculating Pressure drop for control valves and checking the size of PSVs. Simulation, calculation and analysis of Flare network for the back pressure of PSVs utilizing Flare Net software. Collaboration with vendors for evaluating and finalizing data for Crude distillation and Vacuum distillation trays and beds
Eductation
Masters of Science: Chemical Engineering, Islamic Azad University of Tehran (South branch) (Sep.2003)
: BSc: Chemical Engineering, Iran University of Science & Technology (IUST), (Feb.1999)
Certification
Full member of Engineers Australia
Additional Information
2002-2003
PROCESS ENGINEER- PARSIKAN IRAN Engineer& Manager Consultants Company.
2003-2006 continue:•Process engineer for Transfer line of Oil to Abadan Refinery project. Line sizing with Pipe phase software.PFD / P&ID generation and development.
•Process engineer for Construction of Pipe Line from Ahwaz to Rey. Line sizing with Pipe phase software.PFD / P&ID generation and development.
•Process engineer for Chalayok Metering Station. Reviewing FEED documents and line sizing.PFD / P&ID generation and development.
•Process engineer for LAB Feed & Recycle Handling Unit. Sizing the equipment such as Pumps, Lines. Preparing datasheets, PFD / P&ID generation and development, evaluating pump vendor proposals.
•Process engineer for Ahwaz Nezamieh Pump Station. Calculation of Pumps, Lines, PSVs and control valves. Preparing datasheets, PFD / P&ID generation and evaluating pump vendor proposals
2001-2002
PROCESS ENGINEER- Tarhandishan Engineering Consultant Company
•Process engineer for Transfer Line from the low Pressure Parsi Wells to the Production Unit with Multi-phase Pump. Calculation of Line Sizing, two phase fluids with Pipe Phase Software.Adjusting the best position of pump station located between wells to the production unit. PFD / P&ID generation and development