Egypt Zones accountACCOUNT

INSTRUMENTATION AND CONTROLS ENGINEER


This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription. Go to Recruitment Products >>
Education: 4
Experience: 6 years
Relocation: Yes - Internationally

Industry Experience
1 years R & D Scientist
5 years Engineering

Career Objective

• Enjoy taking on new and challenging tasks (Have an interesting work adventure when LNG carrier has only 10 hours on platform and needed to fix critical problem in its control system).

Professional Experience

2004 to Present_____Invensys Engineering & Services Company Cairo Egypt 11742.
FOXBORO Engineer responsible for the developing of I/A (Industrial Automation) software to implement regulatory and interlock control for different plants as well as participation in commissioning and startup activities at site
The projects I have worked for are:

ORYX GTL plant, Qatar – Technip, Italy
• build control for Flare system unit, Intermediate Tankage unit, Final Tankage unit, & Water treatment unit using FOXBORO engineering tools (IACC and Foxdraw).
• develop final product (GTL & Naphtha) loading sequence using FOXBORO High Level Batch Language.
• participate in Factory Acceptance Test (Rome Sep-16 to Dec-16 2004) testing control loops and the interlock logic for the mentioned units in addition to participation in Heavy End Recovery (HER) unit and Effluent water unit testing.
• work through Site activities for loop function check support and service providing including commissioning and startup of Flare system, Hydrogen production, Effluent water, & Synthesis gas Units.

TOGLIATTIAZOT M-M METHANOL plant, Russia – Casale, Italy
• build control for the different units using FOXBORO tools (FOXCAE and Foxdraw).
• develop I/A software interface for MODBUS devices connected to FBM224 FOXBORO Field Bus Module.
• participate in the FAT (Milan May-2 to June-18 2005) and fully test the GEA condenser package interlock control logic.

SONATRACH power plant SERGA-II, Algeria – Nouvo Pignone, Italy
• build control for the different units using FOXBORO tools (FOXCAE and Foxdraw).
• develop I/A software interface for MODBUS devices connected to FBM230 & FBM231 FOXBORO Field Bus Modules.
• develop I/A software interface with GE-GSM MarkVI turbine controller HMI server.

Wael A Rahman +202-3314-8513/+201-0227-7098
PAGE #2

• develop I/A software interface with OPC server via FBM233 FOXBORO Field Bus Module.

2003 to 2004_____Engineering Office of Integrated Projects (EOIP) Cairo Egypt
• Motorola DSP801 micro processor programming using C++.
• Discrete element RF circuits design, simulation, & optimization.

Eductation

BSC of Eloctornics and communications engineering

Hot Categories

Chemicals Batteries

Are you Hiring?


Reach the right candidates to fill your technical positions with Gulfoilandgas Jobs »
Technical Recruitment
Our Career Center has 70,000+ resumes for employers to search »
200-Engineering Consultants » News » Design/construction/Engineering Graphics » News » Engineering » News » Engineering Services » News » Production Engineering » News » Project & Resource Management » News » Training & Education » News » Hydrostatic Testing » News » Inspection » News » Laboratory Services » News » Non Destructive Testing » News » Testing » News » Testing & Inspection Services » News »
Engineer
Mechanical Engineer
Field Engineer
Quality Control/Quality Assurance Engineer
Environmental Health & Safety Associate
Engineering
Technician
Electrical Engineer
Engineering
Petroleum

Field Service Technician
Manager
Information Systems/Technology
Electrical/Mechanical/Structural
Construction Engineer
Civil Engineer
Assistant Manager
Purchasing Management
Chemical Engineer
Project Engineer
Analyst
Engineering
Drilling

Customer Service
Process Engineer
Control Engineer
Project Manager
Electrician
Computer Systems Analyst
Engineering Management
Operations Manager
Specialist
Marketing/Sales Manager
Sales
Construction Technician
Mechanic
Plant Engineer
Driller
Consulting Engineer
Maintenance Manager
Other
Egypt Zones
Copyright © Universal Solutions All rights reserved. - Privacy Policy.