BELHEKAR ANILKUMAR SADASHIV
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 20 years
Relocation: Yes - Internationally
Career Objective
OBJECTIVE
Accomplish the work that is intellectually challenging, having excellent work environment and be a part of the organization in achieving its goals and objectives.
Professional Experience
EXPERIENCE - ABOVE TWENTY ONE YEARS
*RASHTRIYA CHEMICALS AND FERTILISERS LTD, THAL UNIT, (A Govt. of India undertaking).
(Working since Feb. 1987 till date.)
Present Salary :- Rs.5,00,000 per annum (Approx.)
Expected salary:- Negotiable
Job Description and Experience Details:-
A. Working as a Senior Plant Operator (Spl.Gr.II) in Operation Department in a ISO-9000/14001/18000 certified group of Utility plants, namely, DM Water Treatment Plant (400 and 500 M3/Hr), Steam Generation Plant (3 * 275 MT/Hr), Captive Power Plants (2*15 MWH), Naphtha Handling Plant (2*800 MT) producing DM Water, Super heated Steam, Electric Power for Urea, Ammonia and others chemicals plants.
This Senior Operator (Spl.Gr.II) position is equals to the position Asst.Plant Manager and drawing same PAY SCALE.
B. Operation of Boilers according to target specified by integrated ISO integrated system i.e.0.862 Mkcl/Mt.of steam produced.(energy consumption.)
Operation of Turbo Generators according to target 2.8 Mtsteam/MWh electricity produced.
Operation of DM Water Plant according to standard consumption of Acid/Alkali.
Operation of equipments by standard operating procedure (Equipments listed at the last)
C. Also involved in Commissioning of Rosemount RS/3 DCS, Honey Well Experian PKS 301.1 DCS systems in Steam Generation plant –RCF Thal; Honey well DCS system was commissioned On Line as there was no shutdown available for common services which is a common part of the plant I was member of the commissioning team.
*Project Execution : New Installation & System Upgradation.
New Naphtha Handling Plant and Accessories & Duel firing Burner system commissioning.
New Electronic Woodward Governing system for Turbo Gnerators.
New Instrument Air Dryer Project with no air purging, Capacity: 1800 NM3/Hr., Supplier: Elgin Equipment Ltd.
Automation of Boiler Feed pumps with SLC-5/04 and commissioning of Electronic Governor system of Woodward. Worked as a part of team for these projects.
Optimization of Steam Generation Plant:
Studying, Checking & Reviewing of all energy consumed area and Optimize the system for energy conservations.
I was member of the project commissioning team.
Eductation
EDUCATION
B.Sc.(Chemistry)
First class (60 %) -1983. PUNE UNIVERSITY.
OTHER TRAINING COMPLETED
I)Fire and Safety Training.
II)Disaster Management Training.
COMPUTER KNOWLEDGE
Windows 98/XP/Vista, Office XP/Internet.
INTERESTS
Reading, New Technology Upgradation, Watching Movies & cricket, Listening music.
Additional Information
ACHIEVEMENTS
A. Online commissioning of Make up Water Tanks,De-aerators,High Pressure Pre-Heaters as shut down was not possible.
PERSONAL DETAILS
Date of Birth: 28/05/1963
Marital Status: Married
Languages known: Hindi, Marathi and English.
REFERENCES: -
1.Mr. N.P. Palwe , Mobile no: +919423092392
Add. Chief Engineer, Steam Generation Plant, RCF Ltd, Thal, Alibag.
2. MR.P.R.Shelke , Mob: +919372210169
Plant Engineer, Steam Generation Plant, RCF Ltd, Thal, Alibag.
Anilkumar Sadashiv Belhekar.
Hot Categories
Chemicals
Batteries