project engineer
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 6 years
Relocation: Yes - Domestically
Career Objective
To Supervise and coordinate project work for his area of discipline in accordance with contract conditions, working within budget and time constraints to ensure customer satisfaction.
Professional Experience
From January 2008 till now:
Procurement Engineer with Gulf Dredging & General Contractimg Co., (GDC) Kuwait.
Project:SHUAIBA NORTH CO-GENERATION PLANT (OFFSHORE WORKS)
Client : Ministry of Energy (Water & Electricity)
CONTRACTORS: FISIA ITALIMPIANTI
Description of works:
1 Dredging works.
2 Installation of 2000 mm GRP Pipes.
3 Construction & of Installation of riser room.
Responsibilities:
• Obtaining MEW approval for the project materials.
• Seeking the best quotations for the materials.
• Follow Procurement of the project materials.
From August 2006 till January 2008:
Technical Office Engineer with Gulf Dredging & General Construction Co., (GDC)
Project:Renovation and Expansion of South Jetty, Al_Khafji, Saudi Arabia.
Joint Venture Kuwait Gulf oil Co. & Aramco Gulf Operation Co.
Client: AL-KHAFJI JOINT OPERATION
Description of works:
1 Dredging Works
2 Construction of South Jetty 1045 ML
3 Paving (Concrete & Asphalt) Works
4 Construction of Recreation Building, Control room and Public Toilets
5 Construction of Trenches
6 Electro-mechanical Works
7 Fence Works
Responsibilities:
Follow up the following works:
1 Preparing shop drawing for civil works
2 Preparing interim & final payment certificates for over Subcontractors.
3 Preparing shop drawing for Steel Re-bars (bending schedules).
4 Overall responsibility of workshop for fabrication of Steel Re-bars
From April. 2004 To July. 2006:
Civil Engineer for Ministry OF Housing .Hurghada, Egypt.
Project: Construction of Marsa Alam High Way
Client: Ministry OF Housing, Red sea Section.
Responsibilities:
Follow up the Following works:
1 Inspection Survey works.
2 Inspection Back Filling works.
3 Inspection Asphalt works.
4 Inspection Soil laboratory testing.
5 Inspection Asphalt laboratory testing.
6 Quantity Survey works & preparing payment certificates.
7 follow up schedule
From March. 2003 to March. 2004 :
Site Engineer for (Engineering Contractors Company)Ismailia,Egypt.
Project: Construction of 10Housing Building (Nuabaa, South Sinai. Egypt.)
Client: (South Sinai Government).
Responsibilities:
Follow up the Following works:
1 Construction of concrete Skelton
2 Survey works.
3 Quantity Survey works.
4 Office work and following up schedule
Eductation
Qualification :BSc. Civil Engineering
University :Ain Shams University
Faculty :Faculty of Engineering
Date of Award :May – 2001
Cumulative Grade:Good
Project Name :Foundation and Soil mechanics – Design of under ground railway station.
Project Grade :Very Good
Certification
BSc. Civil Engineering
Additional Information
Language Skills
Arabic : Mother tongue
English : Very good.
Computer skills
1 Microsoft Windows, MS. Word & MS. Excel
2 AutoCAD
3 Computer maintenance
4 Internet Browsing
Interests & Hobbies
Reading, Football, Chess,Swimming and Internet Browsing.
Hot Categories
Chemicals
Batteries