ELECTRICAL/ INSTRUMENTATION / COMMUNICATION
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 6
Experience: 20 years
Relocation: Yes - Internationally
Career Objective
I have a tenacious commitment to the success of each and every project / role with a professional attitude toward the flexibility required during the lifecycle of any project.
Professional Experience
Sea Water Injection Plant Project
Saudi Aramco Khurais Department
Engineer 1
„« Responsible for checking all V & D System, F & G System, PA/GA System, CCTV System and HVAC/DDC System works activities for installation, construction and programming for all substations and all non process buildings.
„« Monitor and supervise a group of work force assigned in all area including equipments, tools and manpower distributions.
„« Review drawings/plans issued for construction, technical queries and site modifications for approval.
„« Project monitoring and reporting as necessary for monthly progress for all instrumentation works.
„« Review plans, specification referring to International and SAUDI ARAMCO ENGINEERING STANDARDS.
„« Provide technical assistance to main contractor to develop Constructability Program through out the implementation. Tend to optimize the engineering method, safety objectives and work schedule.
„« Provide the required information, serious impact in the progress for weekly and monthly highlights.
„« Conduct walkthrough inspection with the proponents and contractors. Deficiencies are noted and rectify prior to final acceptance.
„« Ensure that installation and design of systems conforms to Issued for Construction drawings (IFC).
„« Coordinates with QA/QC group to implement the quality of work and for inspections
„« Quality management Information System, Request for Inspection (RFI¡¦s)
„« Conduct weekly construction meeting with ARAMCO and Contractors to discuss related construction issues and progress.
„« Coordinating with SAUDI ARAMCO PROJECT MANAGEMENT TEAM (SAPMT) and SAUDI ARAMCO PROJECT INSPECTION DIVISION regarding work execution and implementation.
„« Conducts field investigation for project site preparation, program of work, cost estimate, construction and equipment schedule.
„« Prepares daily report and accomplishments to be submitted to the Sr. Project Engineer (ARAMCO).
„« Receiving Work Permit for daily work inside and outside plants.
„« Preparing bidding documents.
„« Estimates bill of Quantities AS PER PROJECT SPECIFICATIONS.
„« Check and evaluate all encountered problem and initiate immediate solutions.
„« Solve technical issues encountered at site.
„« Monitoring on-going project activities to meet standard requirements in accordance with the plans and specifications
Eductation
EDUCATIONAL BACKGROUND:
Bachelor of Science in Electrical Engineering
Nueva Ecija University of Science and Technology
Nueva Ecija, Philippines
1981-1986 Start and Year Graduated
PROFESSIONAL EXAMINATION BACKGROUND:
PROFESSIONAL REGISTERED ELECTRICAL ENGINEER
Examination Date: July 30, 1988 (PASSED)
Philippine Regulation Commission
Manila, Philippines
PROFESSIONAL ASSISTANT ELECTRICAL ENGINEER
Examination Date: August 08, 1986 (PASSED)
Philippine Regulation Commission
Manila, Philippines
POLICE OFFICER FIRST CLASS EXAMINATION
Examination Date: September 01, 1996 (PASSED)
National Police Commission
Manila, Philippines
OTHER SHORT COURSES ATTENDED:
Building Wiring
Central Luzon Polytechnic College
Nueva Ecija, Philippines
1985
Certification
Saudi Aramco Business On-Line Training History:
Work Permit Issuer
Work Permit Receiver
Hydrogen Sulfide Safety
Gas Testing
Confined Space Entry
Hazard Recognition
HAZCOM Refresher Chemical Awareness
Fire Safety Awareness
Classes of Fires and Extinguisher
Basic Lifting (Rigging)
Heavy Lifting (Rigging)
Additional Information
BS Electrical Engineering Graduate with 22 years experience Major in Electrical / Communication / Instrumentation and with Field experience ISP/OSP Communications and involved in the Saudi Aramco IT Operation / oil and gas industry / Sea Water Treatment Plant with wide variety of communication equipments CCTV System, F & G System, PA/GA System, V & D System / instrument and control installations DDC system including HVAC System and field instruments, cables, enclosures, trays and grounding.
Experience with hazardous area applications and knowledgeable with national and international standards specially the NEC and NFPA with SAES standard as well. A very good in written and verbal English skills and presenting technical reports and computer literate with advance level of experience in use of office.
Received in a short period of time eleven months the certificate of appreciation related to the advance completion of works for Voice and Data System, PA/GA System, F & G System, CCTV System and HVAC/DDC System under BI-03451 (Sea Water Injection Plant) Project.
Hot Categories
Chemicals
Batteries