ICAPS administrator / Punch List coordinator / Access 2007 database administrator
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 26 years
Relocation: Yes - Internationally
Career Objective
ICAPS Database Administration. /
Punch List Coordinator. /
IPCIS Database Administration. /
Access 2007 Database administrator
Professional Experience
Professional Profile
• Well versed with ICAPS / IPCIS Database applications at Pre-com and Commissioning documentation
• Final Dossier with Punch List clearance on Final Dossiers, about 1250 dossiers, at phase 2 & 3 Iran Oil & gas facilities with more than 120 K items.
• Coordinated with ICAPS Administration by OPERCOM methodology at On-Shore plant and Offshore Platforms at phase 4 & 5 Oil &Gas facilities, Iran, that is over 140 K Items.
• Punch List coordinated with IPCIS Administration (OPERCOM) at petrochemical plant, Petro-Pars, Iran with about 25K items.
• Currently as ICAPS database administration for Total ABK off-shore project in Abu Dhabi.
• Expert at ICAPS / IPCIS Commissioning database Administration. Plus Oracle and Access2003/ 2007.in addition to software like Word, Excel Etc.
Notable Contributions:
July ’08 -Till date At Total ABK Offshore project by Technip France – Abu Dhabi
• Created ICAPS Database for Pre-com and Commissioning task progress management and Assigned tasks for Items by Sub-System.
• Guided the discipline engineers for carrying the task as per OPERCOM for getting RFC, RFSU, RFO and guided Punch management Etc.
Dec.’07-May '08 At CTJV-QCS project, The Qatar gas III &IV Projects (LNG Trains 6 and )
• Integrated different database systems like Marian,PROPS and SMMS, of 8737642 Items with 764580 records for material control.
Nov.05-Sep.07. Arya Sasol Polymer Company, petro-pars, Iran.
IPCIS Admin for Punch List Coordination:
• Created IPCIS database from engineering data for updating the PUNCH LIST Management database at IPCIS and sign off of Punches for sub-system certification of RFC, RFSU, RFO.
Oct 2003-Jan 2005 Eni South Pars Oil & Gas (onshore/offshore) plant, Phase 4&5
Offshore - ICAPS:
• Ensured complete documentation as per OPERCOM & Coordinated for entire PL activities by registration, Tracking & updating of Master Punch list database at offshore platform.
Onshore – ICAPS:
• Administered ICAPS and Guided the ’Document Controller’ for compilation of Dossiers for RFC & RFSU Certification.
Nov 2001 – Dec 2002 Total South Pars Oil & Gas (onshore) plant, Phase 2 & 3
Onshore – ICAPS Administration & Documentation:
• ICAPS administration for RFC & RFSU certification and Compiled pre-com/comm’g dossiers as per OPERCOM & Cleared punch on “Final dossiers” for final handover-client.
Eductation
B.Sc (Chemistry) - First division- University of Madras - 1979,
Additional Information
1.Andrew Thomas,
Construction Manager,
Technip France AD,
Total ABK Offshore,
Mobile: +971 50 7083089/ 026986885
2.Ian Drynan
Materials Manager,
CTJV-QCS project
Mobile: 474-2091
idrynan@ctjv.com
3.Mr. Steve Debbage,
ICAPS / IPCIS Trainer at IPEDEX
Email: steve.debbage@ukonline.co.uk
United Kingdome
4. Mr. Suresh,
Hyundai Engineering & Construction Co. Ltd.,
Phase 2&3 and 4&5 Iran Oil& Gas Facilities.
NOW:
Commissioning Leader,
TOTAL – LNG Project, YEMEN,
Email: suresh_kanda@yahoo.com
Hot Categories
Chemicals
Batteries