project engineer
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 2
Experience: 5 years
Relocation: Yes - Internationally
Career Objective
Working in BELAYIM PETROLEUM COMPANY- BETROBEL (Owner / Operating / Multinational Oil & Gas Co. Egypt) from December 2005 and till present in general projects Dep. – with a projects team as a MECHANICAL PROJECT ENGINEER
Professional Experience
Company representative onboard supervised and follow-up the following duties:
1.Temsah North West 2 platform-Mediterranean Sea (offshore) Platform installation, piping hook up, skids installation onboard of Saipem 3000 barge - Saipem company-ENI.
2.Temsah North West 2 platform-Mediterranean Sea (offshore) Installing-hook up activities for Outlet Sea lines 24" gas line & 10" condensate line, condensate and gas plems, SSIV with its relevant activities hydro test, purging and dewatering by nitrogen-startup&commissioning. PMS. CO. Diving supply vessel MAYO DSV with its operational crew – subsea7 company-England.
3.Temsah-4 platform hook up activities from well head x-tree to production manifold (offshore) SANTAFE CO. – onboard of KEY-MANHATTAN RIG.
4.Semman Platform Sea line laying with 18" size and total length 18000 mt. and preparation of dummy spools for future sub sea hot tapping tie in's (offshore) Onboard of BARGE NO. 11 & 12 PMS. CO.
5.Temsah North West 2 platform-installing of sub sea SSIV with its relevant facilities onboard of TEAM-MUSCAT DSV. NICO MIDDLE EAST LTD. COMPANY and KEY SINGAPORE RIG – SANTAFE CO.
6.WASTE WATER TREATMENT PROJECT in EL-GAMIL plant (onshore) skimming system and treatment processing facilities with injection system in disposal wells.
7.R.P.P. ONSHORE PLANT UPGRADING commissioning & start-up activities.
8.MIOCENE-gas acceleration project :
Project description, Installation of the following new equipments:-
-Slug catcher 4 finger 36” type.
-New stabilizer column (capacity 8000 bbl/day) for condensate stabilization phase separators (1st stage & Glycol H/C separator)
Gasoline Air cooler.
-Relevant inter connecting piping, skids and tie- in’s.
9.new jumper line 14" size with its relevant tie-in from inter piping skid to port fouad LTS train in order to make separation between dry and rich gas coming from marine by convert this LTS train to work as dry gas only.
10.New Fire Fighting Tank Project with Capacity 3000m3 SINAI - Abu Rdeis fields.
see other fields experiences in the additional information box.
SAFETY:
29.Attend contractor HSE meetings, Tool box talks, and safety drills.
Generate/Approve permit to work as per company rules.
REFERENCE PERSON:
ENG.YASSER KAMAL - PROJECT MANAGER - IEOC – ENI COMPANY
Eductation
• Bachelor of Engineering (Mechanical Power & Energy Department) May 2005
• Overall grade: GOOD.
• Graduated project: Design & Construction of a Centrifugal Fan.
• Project grade: EXCELLENT.
Certification
1. ARAB PETROLEUM PIPLINES CO. "SUMED"AIN SUKHNA BRANCH - SUEZ.
2. SUEZ OIL PROCESSING CO. "PETROSUEZ" SUEZ GOLF.
3. STEAM POWER PLANT. "ETAKA" ETAKA - SUEZ.
4. ENGINEERING FOR PETROLEUM & PETROCHEMICALS INDUSTRIAL CO. "ENPPI"COMPANY DESIGNS OF PIPING & PRESSURE VESSELS TRAINING WITH A CERTIFICATE FROM ASME COUNCIL U.S.A.
5. EGYPTIAN TRAINING CENTER "ETC" MODERN MANAGEMENT SKILLS- CAIRO.
6. ARAB ACADEMY FOR SCIENCE, TECHNOLOGY & MARITIME TRANSPORT. MARITIME SURVIVAL COURSE - ALEXANDRIA.
7. PETROSAFE COMPANY - CAIRO. HSE SPECIFICATIONS AND HOW TO DEAL WITH HAZARDOUS AREAS.
8. PETROMAINT COMPANY - ALEXANDRIA.
CONSTRUCTION AND MAINTENANCE OF ABOVE GROUND TANKS ACCORDING TO API 650
9. INTERNATIONAL COMPUTER DRIVING LICENCE COURSE - ICDL CERTIFICATE - SUEZ.
10. RADIO GRAPHY TEST TECHNOLOGY COURSE – CAIRO 2008
Additional Information
11. Company representative in petrojet co. central workshop followed up steel structure manufacturing for the new hanger project.
12. New power generation and gas compression projects including NO. 3 turbines with generators for power generation with 10 m.watt capacity - model GE-10 and NO.2 turbines with compressor for gas compression with 27 m.watt capacity and its relative skids, piping prefabrication and erection - general electric-nuovo pignone company supply.
Generate all work procedures, skids lifting procedures and installation method of statements procedures, piping routing, tie-in's location and negotiate with supplier all site modifications, work priorities planning…etc.
For all the above mentioned projects prepare project relevant hot tapping Tie-in’s with the existing plants sharing with preparing tie-in’s location, philosophy and execution procedure, supervised and reviewed with the executer companies TD WILLIAM SONS. LTD, WELLUBE, PPC companies ...ETC.
Supervised different hot tapping tie-in's sizes execution 2", 6”, 8”, 10”, 12”, 20", 24", 28” …etc.
Hot Categories
Chemicals
Batteries