Over 12 years of work experience in Oil & Gas Processing field(On Shore)
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 12 years
Relocation: Yes - Internationally
Career Objective
: A progressive organization, a career in which I can contribute to the growth of the com
Professional Experience
Professional Experience:
over 12 years of work experience in Oil & Gas Processing field(On Shore)
• Worked as a ¡§Commissioning Supervisor¡¨ for South Pars Gas Field Development, Phase 6, 7 & 8, Bandhar ¡V Bushehr, IRAN from January 2008 to November2008.
• Worked as a ¡§Production Operator¡¨ for Cairn Energy Pty. Ltd. From Jan-2006 to Dec 2007 at Hazira, Surat, Gujarat.
• Worked as a ¡§Shift in Charge¡¨ (Operation & Maintenance) for Oil & Natural Gas Corporation Ltd.(O.N.G.C.), Zero Flaring Compressor Plant at Group Gathering Station (GGS-1&4) from May2005 to Dec-05.
• Worked as a ¡§Field Operator¡¨ for South Pars Gas Field Development, Phase 4&5, Bandhar ¡V Bushehr, IRAN from October 2004 to April 2005.
• Worked as a ¡§Shift in Charge¡¨ (Operation & Maintenance) for Oil & Natural Gas Corporation Ltd.(O.N.G.C.), Zero Flaring Compressor Plant at Group Gathering Station (GGS-1&4) from Feb. 2003 to Sep. 2004
• Worked as a ¡§Process Operator¡¨ for Gas Authority of India Ltd.(GAIL),LPG Recovery Plant Vaghodia, Vadodara From July 2000 to Feb 2003.
• Worked as a ¡§Senior Process Technician¡¨ for Oil & Natural Gas Corporation Ltd (ONGC), CPF, Gandhar from Sept.1996 to July 2000.
Job Profile
National Iran oil company [ NIOC ] South pars field development phase 4&5 phase and 6, 7 & 8 bandhar ¡V bushehr Iran.
Phase 6,7 & 8 is designed to process 3900 mmscfd of reservoir fluid and Phase 4&5 is designed to process 2000 mmscfd of reservoir fluid to produce 80000 bbl/day of condensate, 1100 ton/day of propane 1800 ton/day of butane and 70 mmscfd treated ethane.
I involved in the pre commissioning, commissioning and smooth operation of the fallowing units
Propane refrigeration System and Propane BOG compressor
Eductation
Qualification :
Diploma in Mechanical Engineering (Spl. In Prod.) Through Board of Technical Education, Lucknow. PERSONAL DETAILS
Father¡¦s Name : Shatrughan Prasad Chaubey
Date of Birth : 1st July 1975
Nationality : Indian
Passport Details
Passport No : B 1031634
Date of Issue : 13/12/1999
Date of Expiry : 12/12/2009
Place of Issue : Lucknow
Date : _19/11/2008________
Place : _gorakhpur________
(RAKESH KUMAR CHATURVEDI
Certification
Job Responsibility :
• Routine checking and changeover of pumps, compressors, sphere, dryer, filter, ets.
• Report all abnormalities and failure to Control Room and to take corrective measurement.
• Safe startup and shutdown activities.
• Trouble shooting during Power failure, Instrument failure, Utility failure and DCS failure.
• To give the standby pumps and motors for preventive maintenance.
• Maintaining of Field Log Sheets.
• To Co-Ordinate with Control Room and DCS operation.
• To maintain good house keeping in the plant.
• Provide training to subordinates for operation and safe working practice.
• Ensure normal operation of plant and equipments & safety of personnel.
Additional Information
Propane refrigeration System and Propane BOG compressor
Cairn Energy Pty. Ltd.
This plant is having 150 MMSCFD capcity of processing Natural gas along with Oil processing capacity of 5000 barrels per day. This plant having onshore facilities like Slug catcher, Condensate stabilization, Refrigeration, Dehydration by TEG, TEG regeneration, Oil handling unit. Process gas ( Booster & Main ) compressor, Prim move ¡V TAURUS 60, Gas Turbine (Solar make),
Gas Authority of India Ltd,(LPG RECOVERY PLANT) ,Vaghodia, Gujarat .India
The designed capacity of the plant is to process 2.5 MMSCMD of gas to produce 230 TPD of LPG and 2.39 MMSCMD of lean gas, NGL 11400 TPA adopted cryogenic expansion method using turbo expander.
Experienced in GAIL
„« Gas drying and Regeneration section
„« Chill Down section
„« Natural gas expansion and recompression (turbo-Expander)
„« Fractionation
„« Hot oil system
„« LPG storage and Re-calculation system.
„« CNG loading
In (Oil & Natural Gas Corporation),CPF Gandhar.
Is designed to produce 5000 m3 / day of crude oil along with 1.5MMSCMD of associated gas and 165 TPD of LPG & 55 TPD of NGL (Natural gasoline)
Experience in ONGC
„« Crude Stabilization unit (CSU)
„« Off gas compressor.
„« Crude oil storage & pumping station.
„« Condensate fractionation unit (CFU)
„« Gas injection unit (GIU)
„« Gas lifting compressor
„« Air compressor
Hot Categories
Chemicals
Batteries