Rigger / Scaffolder
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 2
Experience: 20 years
Relocation: Yes - Internationally
Career Objective
perform all tasks with utmost safety
Professional Experience
EMPLOYMENT HISTORY
CURRENT
UNITED GROUP RESOURCES --- B H P Billiton
GRIFFIN VENTURE Offshore Oil & Gas Processing & Storage Facility
POSITION Rigger / Scaffolder Permit to Work Holder
SCAFFOLDING -Erected& dismantled all types of scaffolding, Very Large Hanging Scaffolds ,Spur Scaffolds Truss-out, Independent Towers ,and Birdcage scaffolds over the years, topsides and a large amount of over the side(all incident free)
RIGGING -Rigged up many very large lifts ,Lge Valve Installations ,New pipework, flow lines etc, Risers to Jacket ,New Steel Erection& Installation, Basic rigging for mechanical fitters electricians etc, Wire Rope change out on Favco Cranes &maintenance of, Crane Dismantling ,& Upgrading, Load cell Testing and Inspections. EGT (European Gas Turbine) Core Changes
TECHNIP OCEANIA PACIFIC
2007 – 2008
Rockwater 2 Donghae Project Korea
POSITION Leading hand Rigger/Scaffolder
TECHNIP OCEANIA PACIFIC
Oct 2007-Dec 2007
Kupe Jacket and Topside Installation CLIENT= Origin Energy
POSITION Leading Hand, Rigger /Scaffolder
TECHNIP OCEANIA PACIFIC
July 2007- Oct 2007
Kiheh Project Malaysia (Labuan) Murphy Oil Client
POSITION Leading Hand Rigger Scaffolder
TECHNIP OCEANIA
January 2006-July 20007
POSITION Leading hand Rigger/Scaffolder
TECHNIP OCEANIA
KIKEH PROJECT-MALAYSIA
POSITION -Leading Hand Rigger/Scaffolder
TRANSFIELD /WORLEY—WOODSIDE,
North West Shelf-OIL&Gas
1996-2006
POSITIONS, Rigger /Scaffolder /Dogman
Projects Involved In—PERSEUS OVER GOODWYN(POG),LOW PRESSURE TRAIN CONSTRUCTION AND INSTALLATION,ECHO YODEL SUBSEA PIELINE AND RISER INSTALLATION –PLATFORM MAINTENANCE
DUTIES-Included, Working as a Scaffolder/rigger on all three of Woodside Facilities, ie- Cossack Pioneer, North Rankin A Platform, and Goodwyn A platform but mainly based on GOODWYN A for many years.
ALLTYPE ENGINEERING
1995-1996
JABARU VENTURE-B.H.P.PETROLEUM TIMOR SEA
SCAFFOLDER/RIGGER-Duties included-Riser Turret Maintenance & change out, Erection &dismantling of Scaffolding, Heavy lift Rigging Work
Eductation
technical college