Process Engineer
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 5
Experience: 9 years
Relocation: Yes - Internationally
Career Objective
Seeking an opportunity in Petroleum refinery, Chemical industries, gas processing and drill jobs by proving and improving my ability using my skills in chemical and petroleum industries
Professional Experience
1- Qatargas Operating Company Limited
Laffan Refinery From : 1 / 7 / 2007 Up to Now
Job title : Panel Operator
Nature of the job :Making Commissioning & Startup for Laffan Refinery Consist of : -
•Condensate Fractionation is to process 146,000 BPSD
•Saturation Gas Plant is designed to process 71,380 BPSD
•LPG Trim Treating is designed to process 850 TPD
•Naphtha Hydrotreating is designed to process 71,000 BPSD
•Kerosene Hydrotreating is designed to process 53,850 BPSD
•Hydrogen Plant Unit is designed to Product Purity 99.9%
•Amine Regeneration is designed to provide 55 t/h
•Sour Water Stripping is designed to process 13,500 kg/h
•Tow Steam Generation design capacity of each boiler is 13 t/h.
•Compressed Air capacity 1,250 Nm3/h
•Nitrogen Generation is designed to process 613 Nm3/h.
2.Nasr Petroleum Company
(Refinery under the Authority of Egyptian General Petroleum Corp.)
From : 29/04/2003 To 30/06/2005
Job title : Process Engineer
Job Covers :
Pre-commissioning, Commissioning & Start-up of 50 ton/h 15 barg, 350 oC Two Utility Steam Boilers.
Start- up till steady operation of 3 MMton/year Atmospheric Distillation Unit.
Start - up till steady operation of 1200 ton/day VRU (LPG PLANT) Unit.
Start- up till steady operation of 500,000 ton/year Naphtha Stabilizer Unit.
Member of The technical committee studying the development & replacement of automatic control systems in Nasr Petroleum Company in 3 projects :
1.The replacement of old DCS system (ABB Taylor system) with YOKOGAWA (CENTUM 3000) in atmospheric distillation 3 Million Ton /Year & Vapour Recovery Unit (LPG plant) 500,000 Ton LPG/Year.
2. The replacement of old DCS system YOKOGAWA with ABB in atmospheric distillation plant 1.5 Million Ton /Year.
3.Development the automatic control systems of 3 vacuum distillation units from using local panels to using ABB DCS.
3- EDC (Egyptian drilling company) From :1/1/2003 to 1/5/2003
Job Title : Assistant floor man
Nature of the job: Work in the East desert at (Abu Reads) drilling and discover oil fields in Rag 5 in the Mud system and in the Rig floor.
I have good knowledge about: Rig components, Making a connection, Casing and cementing, Types of rotary drilling bits and Mud engineering.
Eductation
1993-1996 Suez Military high school
1997-2002 Faculty of Petroleum & Mining Engineering, Suez.
Bachelor of Refinery Eng, Suez Canal University.
Grade : Good
Project: production of Polyethylene by high pressure to product low density Polyethylene. Grade in (B.SC Project): Excellent
Certification
In Qatar Gas Training Center :-
1- First Aid.
2- Work To Permit.
3 – H2S effect and B/A Set.
4 – IIF Course.
*ENSPM-FI - IFP Training
1- Refinery Process ( 5 days)
2- Rotating Equipment ( 5 days)
3- Thermal Equipment ( 3 days)
4- Commissioning and start-up operations of process units ( 5 days)
8-CentrifugalCompressor (Associated with Elliott Ebara Turbo-machinery Corporation). ( 5 Days )
Additional Information
Training Courses
1- In Nasr Petroleum Co Training Center
1- Refinery plant operation in Nasr Petroleum Co.
2-DCS operation in Nasr Petroleum Co.
3-Boilers Water treatment.
4-Fire fighting.
5-Safety in petroleum refinery
2- In SOPC Training Center.
1-Maintenance for Engineers.
2-HSE course in Suez oil processing Co.
3-Introduction of Primavera Program.
3- In ENPI Training Center.
1- Corrosion and Cathodic protection systems.
2- Heat transfer and combustion in furnaces.
4-Technology of refinery. (Associated with Canadian petroleum Institute).
5- Introduction of SCADA Control System.
Hot Categories
Chemicals
Batteries