PROCESS SUPERVISOR, DCS PANEL OPERATOR
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 5
Experience: 16 years
Relocation: Yes - Internationally
Career Objective
Full familiarise with CENTUM-3000 YOKOGAWA OPerations. Controlling the process parameters of Gas treatment(MDEA technology),Propane treatment,propane refrigeration units, NGL fractionation.condensate stabilisation units, offsite utilities.
Professional Experience
JOB PROFILE(ON-SHORE OIL&GAS/PETROCHEM)
1. South pars Oil & Gas field development Project, phase 9 & 10 -IRAN
Phases Designed to Process 2000MMSCFD of Multiphase fluid to produce 100000 BPD of condensate, Sales gas (METHANE) production of 1800MMSCFD, 1700 TPD of purified ETHANE for petrochemical complex, 1800 TPD of PROPANE and 1100 TPD of BUTANE .
a.
b. SLUG CATCHER-Operation, Desalter Unit working principle, separation light ends(Methane, and other hydro carbons..
Working Experience Unit:
„X Gas Sweetening(Treating) : MDEA Technology
„X Gas Dehydration unit (Molecular Sieves)
„X Gas Chilling & Ethane Recovery Unit (Cryogenic Cold box)
„X
2. M/S. CHEMPLAST SANMAR LTD-INDIA
Cracking of Ethylene Dichloride (EDC) for the production of Vinyl chloride Monomer and HCL. This plant capacity to produce 100,000 TPA of PVC resins.
VCM cracker technology has been supplied by STRUTHER WELLS , USA.
The produced VCM is polymerized batch reactors to get the desired grade of
Of PVC resins.
CHLOROMETHANES PLANT:
Annual capacity 35000 TPA , VOLCAN TECHNOLOGY ,(PRODUCT- Methyl chloride,Methylene chloride, chloroform, and carbon tetrachloride.(Total 10 years of exp. in this plant.
3. Gas authority of India ltd:
UNITS: LPG plant ,GPU (Gas processing unit-Gas sweetning),Glycol
Dehydration, Boiler(Macchi) & Utilities (cooling towers,Instrument Air
System,Fuel gas system, Inert-gas plant, Waste water management etc,
Equipments Handled: Gas turbines, Fractionation units, Storage tanks
Equipments Handled (onshore):
1. Valve trays column for Amine absorbtion and capacity 400.5 m3. op.pressure = 64.9 barg
2. Fuel gas absorber, Flash gas 14 barg
3. HIPPS (High integrity pressure protection system) as an alternate to conventional pressure protection system.
4. Knowledge in ESDV,SDV, On/OFF VALVES.
5. COLD BOX. Brazed Aluminium plate Fin type
6. Refrigerant Compressor &Feed gas expander
7. RESPONSIBILITIESl:
a. Contiuous monitoring of process operation parameters pressure , temp , flows. Through CENTUM-3000 YOGOKAWA SYSTEM.
Eductation
1.B.sc.chemistry year of passing April 1988
2. M.C.A (Master of computer Application), Passed in Ist class, Year of passing June 2006.
Certification
H2s gas trained and safety class attended and holder of the certificate.
Hot Categories
Chemicals
Batteries