welding inspector
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 3
Experience: 18 years
Relocation: Yes - Internationally
Career Objective
Api-650 and Api-620 tanks after clearance from Saudi aramco and snamprogetti. After hydro test final submit of quality documents and receive tank completion certificate.
Professional Experience
As a mechanical and welding inspector for 08 API-650 tank, 04 API-620 tanks. Material receiving inspection. Inspection of welding consumable receiving and storage,handling.fit up inspection before and after welding, check peacking,banding,plumbness,roundness,shell to shell height as per drawing. Welding inspection during and after completion of shell welding. Preparation of all required reports. Mark radiographic location as per code requirement. Submit weakly radiographic status, welding repair rate. If repair mark the location and arrange NDT requirements and reshot the spot.
Eductation
„« Diploma of associate engineer D.A.E. (Mechanical Technology).
„« Intermediate from Punjab board of Pakistan
Certification
„« APR 2006 CSWIP 3.1 Welding Inspector.
„« CSWIP Certificate No. 24025 ( EXP.APR.2011 )
„« ASNT LEVEL II PT / MT
„« Aramco Certification As Welding And Mechanical Inspector.( SAP # 70005617 )
„« Aramco Certification As Welding And Mechanical Supervisor.( SAP # 70005617 )
„« Driving License K.S.A. EXP.
Additional Information
(OCT 2003~MARCH 2008 WITH OLAYAN DESCON)
JUL 2006~MARCH 2008 OLAYAN DESCON, K.S.A. (S.ARAMCO AND SNAMPROGETTI).
KHURSANIYAH PRODUCING FACILITIES.(K.P.F.)
WELDING & MECHANICAL INSPECTOR FOR TANK ERECTION.(API-620 & API-650)
As a mechanical and welding inspector for 08 API-650 tank, 04 API-620 tanks. Material receiving inspection. Inspection of welding consumable receiving and storage,handling.fit up inspection before and after welding, check peacking,banding,plumbness,roundness,shell to shell height as per drawing. Welding inspection during and after completion of shell welding. Preparation of all required reports. Mark radiographic location as per code requirement. Submit weakly radiographic status, welding repair rate. If repair mark the location and arrange NDT requirements and reshot the spot.
Submit quality documents prior to hydro test. Clear all punch list given by snamprogetti welding/mechanical quality department. Arrange the hydro test. For Api-650 and Api-620 tanks after clearance from Saudi aramco and snamprogetti. After hydro test final submit of quality documents and receive tank completion certificate.
Hot Categories
Chemicals
Batteries