Egypt Zones accountACCOUNT

welding inspector


This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription. Go to Recruitment Products >>
Education: 3
Experience: 18 years
Relocation: Yes - Internationally

Industry Experience
5 years Quality Control/Quality Assurance Engineer
6 years Quality Control/Quality Assurance Engineer
6 years

Career Objective

Api-650 and Api-620 tanks after clearance from Saudi aramco and snamprogetti. After hydro test final submit of quality documents and receive tank completion certificate.

Professional Experience

As a mechanical and welding inspector for 08 API-650 tank, 04 API-620 tanks. Material receiving inspection. Inspection of welding consumable receiving and storage,handling.fit up inspection before and after welding, check peacking,banding,plumbness,roundness,shell to shell height as per drawing. Welding inspection during and after completion of shell welding. Preparation of all required reports. Mark radiographic location as per code requirement. Submit weakly radiographic status, welding repair rate. If repair mark the location and arrange NDT requirements and reshot the spot.

Eductation

„« Diploma of associate engineer D.A.E. (Mechanical Technology).
„« Intermediate from Punjab board of Pakistan

Certification

„« APR 2006 CSWIP 3.1 Welding Inspector.
„« CSWIP Certificate No. 24025 ( EXP.APR.2011 )
„« ASNT LEVEL II PT / MT
„« Aramco Certification As Welding And Mechanical Inspector.( SAP # 70005617 )
„« Aramco Certification As Welding And Mechanical Supervisor.( SAP # 70005617 )
„« Driving License K.S.A. EXP.

Additional Information

(OCT 2003~MARCH 2008 WITH OLAYAN DESCON)
JUL 2006~MARCH 2008 OLAYAN DESCON, K.S.A. (S.ARAMCO AND SNAMPROGETTI).

KHURSANIYAH PRODUCING FACILITIES.(K.P.F.)

WELDING & MECHANICAL INSPECTOR FOR TANK ERECTION.(API-620 & API-650)
As a mechanical and welding inspector for 08 API-650 tank, 04 API-620 tanks. Material receiving inspection. Inspection of welding consumable receiving and storage,handling.fit up inspection before and after welding, check peacking,banding,plumbness,roundness,shell to shell height as per drawing. Welding inspection during and after completion of shell welding. Preparation of all required reports. Mark radiographic location as per code requirement. Submit weakly radiographic status, welding repair rate. If repair mark the location and arrange NDT requirements and reshot the spot.

Submit quality documents prior to hydro test. Clear all punch list given by snamprogetti welding/mechanical quality department. Arrange the hydro test. For Api-650 and Api-620 tanks after clearance from Saudi aramco and snamprogetti. After hydro test final submit of quality documents and receive tank completion certificate.


Hot Categories

Chemicals Batteries

Are you Hiring?


Reach the right candidates to fill your technical positions with Gulfoilandgas Jobs »
Technical Recruitment
Our Career Center has 70,000+ resumes for employers to search »
200-Engineering Hydrostatic Testing » News » Inspection » News » Laboratory Services » News » Non Destructive Testing » News » Testing » News » Testing & Inspection Services » News »
Engineer
Mechanical Engineer
Field Engineer
Quality Control/Quality Assurance Engineer
Environmental Health & Safety Associate
Engineering
Technician
Electrical Engineer
Engineering
Petroleum

Field Service Technician
Manager
Information Systems/Technology
Electrical/Mechanical/Structural
Construction Engineer
Civil Engineer
Assistant Manager
Purchasing Management
Chemical Engineer
Project Engineer
Analyst
Engineering
Drilling

Customer Service
Process Engineer
Control Engineer
Project Manager
Electrician
Computer Systems Analyst
Engineering Management
Operations Manager
Specialist
Marketing/Sales Manager
Sales
Construction Technician
Mechanic
Plant Engineer
Driller
Consulting Engineer
Maintenance Manager
Other
Egypt Zones
Copyright © Universal Solutions All rights reserved. - Privacy Policy.