Good all-round experience in hands on field and supervisory capacity in Pipeline, Mechanical, and Oil and Gas Plant Projects ranging from small works
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 5
Experience: 9 years
Relocation: Yes - Internationally
Career Objective
Good all-round experience in hands on field and supervisory capacity in Pipeline, Mechanical, and Oil and Gas Plant Projects ranging from small works to multi-million pound contracts. Experienced in Plant Maintenance, pre-commissioning, commissioning
Professional Experience
August 2007 to present
South Middle Area Gas Project LEAD Contracting
Site engineer for the project owned by SGC ( Syrian Gas company ) , the main contractor is STG ( Story Trance Gas ). The project is a gas plant for sour and sweet gas with sub stations, my job is to supervise the activity on the site and work shop starting from the steel structure fabrication and erection on site, moving to the piping activity on the work shop and on pipe rack and underground piping, to the erection of equipment.
Mar. 2007 to July 2007
Rabigh Development Project CAT CO. (Contracting and trading)
(SAUDI ARABIA)
Pipeline engineer for Rabigh Development Project, the project is two pipelines 18” and 6” moving from Yanbu to Rabigh with length of 213 KM with all the facilities along the line and inside the two refineries (launcher and receiver, metering skid)
I was responsible of following all the activity on site and work shop.
Oct. 2006 to Feb. 2007
Arabic Gas Pipeline Project STROYTRANCEGAS
Pipeline Hydrotest Engineer
Direct on-site supervision of the Hydrotest of the Arabic gas pipeline ( 320 km ) which run from Jordanian border till homs in the middle of Syria . including working in the procedure to modify it as standards and cleaning and gauging of the sections before Hydrotest , and commencing the Hydrotest on sections (30 km long) , and de-watering and final cleaning and drying of the line.
Aug. 2004 to Sep. 2006 LEAD Contracting,
Pipeline Commissioning Engineer Damascus, Syria
AFPC (Al Fourat Petroleum Company)/Water Injection System (Mega Pump)
Direct on-site supervision of Field and Fabrication Shop, Dealing with the punch list and the modification to the piping system (8 to 10 ") needed after re-analyses of the HAZOPs, Preparation of start up, And all related documents.
DEZPC (SGC/TOTAL-FINA-ELF)
Direct on-site supervision of Field and Fabrication Shop, Pre-Commissioning, Commissioning, Start-Up and Operations for the Jafra Gas Lift Project in the Syrian Desert. Comprising 2 x 6” and 1 x 3” manifolds, cross-country pipelines (23 km), flowlines to wellheads (14 km), and wellhead hook-ups. Prepare, write site procedures, and compile dedicated test packages for the same.
Eductation
B.E Mechanical Engineering (Design and Production), Damascus University.
Hot Categories
Chemicals
Batteries