Document Control Specialist
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 3
Experience: 9 years
Relocation: Yes - Internationally
Career Objective
A proactive intelligent and innovative professional with extensive ‘₯hands on‘¦ expertise combined with wide experience in setting-up and implementation of Document Management Functions.
Professional Experience
« Performed digital conversion of project documentation by computer scanning (with scan to folder option) of all final documentation (IFA & IFC) and validating the scanned documents as per hardcopy versions and ensured the standards are met.
« Provided training to project team and contractors for all digital scanning activities and introduce the standards to be utilized.
« Provided expertise in the implementation of cost effective SCANNING BUREAU in the Centralized Document Control Center and develops a comprehensive index, prior to data capturing, imaged such documents, including quality control, security measures and stores all META-DATA in the network for easy access.
« Performed ad-hoc conversion of document from hardcopy to softcopy and distribute the documentation to the respective custodians.
« Maintained, Updated & Archived All Project Documentation as per EDDR (Engineering Document/Drawing Deliverable Register)
« Provided the latest EDDR list to Project Manager & Project Team to ensure the project documentation are up to date and current, with all Project documents and filing control are kept in conformance & compliance with Project Document Control Procedure.
« Assisted in performing the quality checks for all As-Built drawings been carried out during all project phases are in line with the company approval given. During design stage (IFR, IFA & IFC), As- Built and Final As-Built.
« Assisted in distributing the Final Documentation accordingly as per the distribution matrix for relevant recipients i.e. Platform, Asset, Project Management Team both and EA BOX (Archive tool) hard and softcopy
« Maintained and updated all tracking matrix / database update and synchronized accordingly with EA BOX (Archive Centre) database for future retrieval and references.
« Maintained tidiness and security of the archive area
« Ensured proper equipment/systems are available (Toners, Papers, Developers).
« Maintained and updated the document inventory database and operate document tracking system. Task includes assigning the project documents / reports into category, labeling and filing.
Eductation
X Higher Diploma in Computer Systems and Design at National Institute of Business Management (NIBM), Sri Lanka
X BCS (British Computer Society) Part I and Part II
X CIMA (Chartered Institute of Management Accountants) Part I, UK
Additional Information
EXPERTISE & STRENGTHS
« Excellent knowledge and experience in Electronic Database Management Systems (EDMS) ‘V Aconex
« Hands on experience in Document Imaging
« Competitive IT knowledge (Software & Hardware) with extensive experience in MS Office Packages with wide knowledge in complex tools like Macros, Calculations & Mail merge etc (Numerate and Accurate)
« Effective communicator with good understanding in Construction Teams roles and processes (Full Project Life Cycle)
« Excellent in Time Management and Multi-tasking abilities
« Logical and well organized with ability to priorities.
« Ability to work under pressure and produce results
KEY ACHIEVEMENTS
« Provided expertise in imaging system in the SCANNING BUREAU in accordance with best practices in the industry www.aiim.org, www.convert.doc and www.arma.org
« Managed Electronic Document Management System (EDMS) in a world class Real Estate Development Projects.
« Implemented imaging system by minimizing the document hard copy method by a centralized scanning desk and successfully achieved to control the cost from most effective use of scanning desk for all the mega projects involved.
« Developed & Implemented Document control and communication procedure (document distribution matrix in line with documents deliverables) for all projects involved with and monitored its implementation.
Hot Categories
Chemicals
Batteries