Egypt Zones accountACCOUNT

Petroleum Engineer


This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription. Go to Recruitment Products >>
Education: 5
Experience: 20 years
Relocation: Yes - Internationally

Industry Experience
20+ years Engineering - Petroleum

Career Objective

To work in an internationally renowned oil and gas company in the petroleum descipline.

Professional Experience

I joined in 1984, the Oil and Natural Gas Corporation which is the premier oil company in India operating in both upstream and downstream sectors. Since joining till date, I worked both in the upstream and downstream sectors. I’ve worked at the Mumbai high, Assam and Ahmedabad oil fields of ONGC and also at the Uran oil and gas plant of ONGC wherein facilities are available for stabilization of crude oil and processing of natural gas for extraction of value added products.

My professional experience therefore lies both in oil/gas processing and oil/gas production operations.

Petroleum engineering experience at ONGC oilfields ( 14 years)
( From 1984- 1992 at ONGC MUMBAI and again from 2002 till date at ONGC Assam and ONGC Ahmedabad ( Onshore )
I worked in various areas in the production group, often with MDTs , the important functions as detailed below.

Broad Work Experience.

Responsible for production optimization, well workovers, completions design and maintenance of production efficiency.

Identify, rank and optimize well-work based on production maintenance, production increase and reserve increase.

Prepare and implement downhole completion and workover programs on new and existing wells in close cooperation with reservoir engineering, drilling and geology department professionals.

Responsible for production logging, well test design and analysis, coiled tubing applications, electric and slick line operations, well integrity and well control.
Design and implement optimal artificial lift.
Design and implement horizontal and multi-lateral well completions, stimulation and workovers.
Implement root-cause failure analysis of artificial lift.
Track and implement improvements to reduce failures and downtime.
Maintain a database of all completions and workovers.
Identify successful and unsuccessful practices and make recommendations to improve the success ratio.
Keep current on new technology.
Identify and present new production engineering technologies for approval of field-testing.
Prepare and present professional presentations for technical meetings.
Have an active role in personnel development in the Department through supervision, work reviews, training and mentoring

Eductation

1979- 1983 Laxminarayan Institute Of Technology
Nagpur University, Nagpur, India
B. Tech (Chemical Engg.)

First Class With Distinction (75%)

1983- 1985 Indian Institute Of Technology, Mumbai ,INDIA

M. Tech (Chem Engg.) with specialization in
“ Transfer Operations “ (Heat and Mass transfer)
CPI – 7.91

Additional Information


Worldwide Experience :

Worked on a four-month assignment from May to Sept –2000 at Sidi Kerir petrochemical complex, Alexandria, Egypt. The 300000 MTY ethylene plant was constructed and commissioned by M\S TOYO Engg, Japan on a turnkey basis. I was given the responsibility of commissioning the associated wastewater treatment plant single-handedly. The plant was successfully commissioned by sept.00.


Papers Published

1) Combating gas interference in SRP wells of charali field , ONGC ASSAM : Paper published in the international seminar “Lifttech 2006” on artificial lift held at Mumbai, India in April-06
2) Relook on feasibility of ESP completions in Assam Asset of ONGC : Paper published in the international seminar “Lifttech 2006” on artificial lift held at Mumbai, India in April-06

Additional professional activities

I am associated with a number of other activities during the period mentioned above. A few of them are as under.
• ISO 9002 and ISO 14001and Ohsas 18000 : - Involved in activities related to formulation and subsequent award of these standards and further successful implementation of these. Working regularly as an auditor during internal audits.



Hot Categories

Chemicals Batteries

Are you Hiring?


Reach the right candidates to fill your technical positions with Gulfoilandgas Jobs »
Technical Recruitment
Our Career Center has 70,000+ resumes for employers to search »
700-Petroleum and Geology Camp Building » News » Cleaning Equipment, Services » News » Communication » News » Construction Contractors » News » Corrosion Products/Services » News » Diving Contractors » News » Exploration » News » Food Supplies » News » Labor Services » News » Land & Leasing » News » Maintenance and Repair » News » Offshore/Onshore Construction » News » Oil & Gas Companies » News » Oil Field Services » News » Pipeline Services » News » Safety Services » News » Service Companies » News » Skilled Labors » News » Subsea Production » News » Transportation, 4X4 Trucks » News » Unskilled Labors » News » Utility Systems » News » Waste Disposal » News » Water Supply Services » News » Welding Products/Services » News »
Engineer
Mechanical Engineer
Field Engineer
Quality Control/Quality Assurance Engineer
Environmental Health & Safety Associate
Engineering
Technician
Electrical Engineer
Engineering
Petroleum

Field Service Technician
Manager
Information Systems/Technology
Electrical/Mechanical/Structural
Construction Engineer
Civil Engineer
Assistant Manager
Purchasing Management
Chemical Engineer
Project Engineer
Analyst
Engineering
Drilling

Customer Service
Process Engineer
Control Engineer
Project Manager
Electrician
Computer Systems Analyst
Engineering Management
Operations Manager
Specialist
Marketing/Sales Manager
Sales
Construction Technician
Mechanic
Plant Engineer
Driller
Consulting Engineer
Maintenance Manager
Other
Egypt Zones
Copyright © Universal Solutions All rights reserved. - Privacy Policy.