Career Objective
OBJECTIVE
To work in a progressive and growing organization where my skills are realized and my knowledge as a Mechanical Engineer is enhanced for my personal development as well as for the benefit of the organization
Professional Experience
MATERIALS
• Receipt inspection of Equipment and sub assemblies required for the project as per standard document
• Carried out receiving inspection, raw material inspection for project materials
• Layout and cutting, Material Traceability
FABRICATION
• Joint Fit-up configuration, attachment of welds and dimensional checking.
• Co-ordinating with Design, Inspection and Shops for various tests and testing agencies during the process of indigenization of Proprietary items, Equipments, Fasteners, Standard parts.
• Study of finishing process, Heat treatment, pre/post operations treatment, surface protection to relevant standards as applicable.
• Co-coordinating inspection personnel, reviewing inspection findings and repairs, remediation recommendations,
WELDING
• Consumable Storage & Handling, Consumable Specification
• Welding process/Equipment Calibration, Welders Qualification
• Preparing the Welding procedure specification, Welding procedure qualification records
• Witness mechanical testing and reviewed the test report.
• Visual Inspection for surface appearance and weld soundness
NDE
• NDT Procedures / operator qualifications, verifying NDT techniques meets project specification
• Coordination with NDT Technicians/Subcontractors.
• NDT activities and verify result.
INSPECTION FOR TESTING
• Pre-test punch listing, Release for Pressure test
• Verify NDT status
• Check test pressure requirement
INSPECTION DURING TESTING
• Witnessing of High/Low Pressure hydro testing of Pressure vessels and Piping systems
• Coordination with consultants, Class Surveyors, Clients and Sub contractors.
• Witnessing of Chemical Cleaning, flushing of Pressure vessels and piping systems.
INSPECTION AFTER TESTING
• Reinstatement Punch listing
• Releasing for commissioning
• Approval of Final Documentation
PAINTING
• Reviewed paint system with specification
• Inspected blasted surface for specified surface finish and anchor profile
• Inspected component after application of primer, intermediate, final paint coating for minimum WFT & DFT specified among paint parameter
FIRE PROOF & INSULATION
• CFP & PFP coating Inspection for Fire proof job
• Insulation Inspection
FINAL DOCUMENTATION
• Preparation of test packs according to the P & ID
• Verifying production documents
• Approval & submitting final documents to Client/Class
Eductation
EDUCATIONAL QUALIFICATION
Diploma in Diagnostics Radiography (1986-1989).
Diploma in Mechanical Engineering (Incomplete)
Certification
NACE CIP I - COATING INSPECTOR PROGRAM NACE INTERNATIONAL
CSWIP 3.1 - WELDING INSPECTOR (WAITING FOR RESULT)
ASNT Level I – Radiographic Testing
ASNT Level II – Radiographic Film Interpretation
ASNT Level II – Penetrant Testing
ASNT Level I – Ultrasonic Testing
ASNT Level II – Magnetic Particle Testing
ISNT _ ADVANCED RADIOGRAPHIC TESTING
SAFETY COURSES
Personal survival Techniques and basic fire fighting (Held in KNPC Kuwait.)
Additional Information
FAMILIAR WITH CODES AND STANDARDS
• ASME-Section IX - Welding and Brazing Qualification.
• ASME-Section V - Non-destructive testing.
• ASME-Section VIII- Boiler & Pressure Vessel code.
• ASME B31.3 - Process Piping.
• AWS D 1.1 - American Welding Society.
• ABS - American Bureau of Shipping Rules.
• DNV - Det Norske Veritas rules for shipping and offshore standards.
• LR - Lloyd’s Register Rules for shipping.
• API - American Petroleum institute.
• IACS - International Association of Classification Societies.
PROJECT : PRESSURE VESSELS
CLIENT : LNG YAMEN
THIRD PARTY INSPECTOR : A.I, TECHNIP
COMPANY : OIL FIELDS SUPPLY CENTRE LTD. AN ISO9001-2000 COMPANY, having U-STAMP, R-STAMP & S-STAMP certified company
(i)PROJECT : PIG LAUNCHER & RECEIVER (ASME ‘U’ STAMP)
CLIENT : ADCO
THIRD PARTY INSPECTOR : A.I, ADCO
(ii) PROJECT : PIG LAUNCHER & RECEIVER
CLIENT : ZADCO
THIRD PARTY INSPECTOR : GL, ZADCO
(iii) PROJECT : PRESSURE VESSELS
CLIENT : GASCO ABU DHABI
THIRD PARTY INSPECTOR : MOODY, BV
(iv) PROJECT : MODULE BEARTH NO -5 & 6
CLIENT : QATAR GAS
THIRD PARTY INSPECTOR : TECHNIP (CTJV), FLUOR, QATAR GAS