petroleum engineer at HBS international Egypt
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 1
Experience: 7 years
Relocation: Yes - Internationally
Career Objective
Working in oil & gas fields
Professional Experience
Reservoir Evaluation:
Participated in reservoir evaluation and interpretation activities using the available production data.
Determined Original hydrocarbon in Place and estimated different reserves categories
Recommended optimum production strategies and development plans (infill wells, Re-completions , workover’s, stimulation, shut-off watered out zones,).
Designed DST (drill stem test) operations in gas and oil wells. Performed final transient test interpretation and reporting.
Designed different completion program
Selected and interpreted the RFT .
Interpreted the open-hole and cased hole logs qualitatively.
Transient analysis by Saphair , PIE , PanSys , & Weltest200 programs and match posper program , and WelFlo program for Nodal Analysis Inflow and outflow well performance , sensitivity for reservoir and production parameters, design for ESP , Jet pump , and gas lift.
OFM program : able to buildup a new project, decline curve analysis to forecast the remaining reserve , monthly back allocation , production performance , well sketch , and well logs.
Cased hole log interpretation : PLT to determine the contribution of each zone.
TDT to determine the remaining oil saturation ,water saturation ,and hydrocarbon
contact
Recommended optimum production strategies and development plans (infill wells,
Recompletions, work-over, stimulation, and shut-off watered out zones).
Design for ESP , select the suitable pump ,number of stages , motor type ,and cable size.
Design for Jet Pump , select the suitable down hole combination and surface unit.
Sharing in Gas lift Design : valves depths , and injection gas rate .
DST Drill Stem Test design & operations.
Perforation job : TCP Shot and drop , casing guns.
under balance and displacement volume calculations in case of mechanical or
hydraulic firing
Running completion : Normal completion string , Electrical submersible pump ESP, Progressing cavity pump PCP ,Sucker rod completion, and Gas lift mandrels .
Fracturing job operations .
Recording RFT or SFT points.
Water Shut-off jobRig Work-over program
Eductation
B.Sc in Petroleum Engineering. Since 1999, Cairo University ,& Good grade 69.2 %.
Certification
Petroleum programs & courses:
OFM (Oil Field Manager) well and reservoir analysis Software.
Prosper (Petroleum expert program for Nodal analysis) .
WelFlo program ( Nodal analysis) .
PipeSim program for Net work analysis .
Saphair , PIE , PanSys ,& Well test 200 programs
Crystal Ball (Risk analysis software ).
Camco program for gas lift design .
Weatherford for jet pump design.
ESP course( Reda pump company ) .
Sucker rod course (Lufkin company ).
Applied reservoir engineering course .
Gas reservoirs course .
Well test course.
Fracturing technique course.
Gas lift course .
Core & PVT analysis course
Additional Information
Computer Skills & others :
Microsoft Office package .
Good Commend in the internet .
Active worker and have good ability for communication and work in team .
Hot Categories
Chemicals
Batteries