design engineer instrumentation and control oil and gas EPC
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 3 years
Relocation: Yes - Internationally
Career Objective
To meet organizational goals in the field of Instrumentation with continuous improvements in personal and technical skills.
Professional Experience
WORK EXPERIENCE
SAMSUNG Engineering Pvt. Ltd. July 2007-Till date
Design Engineer (Control and Instrumentation)
Proposals:
Period: September 2008- December 2008
Proposal Specification
Yanbu Export Refinery Project 400,000 barrels per day of Arabian heavy crude oil
UGCC Ethylene Project 387 KTA of Ethylene
UGCC Utilities and offsite Project For gas separation, ethylene, poly propylene and poly ethylene plants.
Job Description
Prepare proposal and understand complete engineering requirement of project and estimate complete EPC cost of the project.
Prepare Instrument Index, Input Output list, Instrument list
Prepare data sheet for all instruments for getting pricing and evaluating the offer technically.
Conceptualize Foundation Field bus system for complete project.
Conceptualize System Configuration for entire project.
Estimate cable requirement for complete project and preparing specification for cables.
Project:
Period Project Specification
July 2007 to September 2008 Mono Ethylene Glycol Project, Panipat, India 303,000 TPA capacity of IOC's Panipat Naphtha Cracker Project
January 2009 to Till Date DFECU and AU Opal (ONGC consortium), Dahej, Gujrat 1.1MTPA capacity dual feed cracker Unit, Pyrolysis gas hydrogenation unit, benzene extraction unit, butadiene extraction unit etc.
Job Description: -
Data Sheet for various Field Instruments and subsequently evaluating the offers from various vendors, Data Sheet and sizing of Control Valves. Put instruments in PIDs and prepare closed loop control circuit
o Preparation of detailed Instrument Index.
o Selection and Sizing of major instruments like Control Valves and Orifice Plates.
o Preparation of Layout: Preparation of Wiring Layout, Cable Schedule, Duct Sizing, Cable Tray, Cable length etc.
o Preparation of Technical Specification of Instruments Data Sheets, Instrumentation cables etc.
o Preparation of Hookup drawings and MTO for instruments.
o Preparation of Instrument location plan, Instrument Installation drawing, Instrument Logic, Loop Diagram.
o Technical Bid Evaluation: Technical Evaluation and vendor print check for various instruments like Orifice plates, Control valves, Gauges and Transmitters, Duct and Trays etc.
Eductation
EDUCATION
Institute Course Percentage Year of Passing
Institute of Technology and Management, Gurgaon, Haryana B.E. (Electronics and Instrumentation) 67% 2007
Vidya Mandir Public School, Faridabad, Haryana 10+2 (Secondary School) 81% 2003
Vidya Mandir Public School, Faridabad, Haryana 10 (High School) 87% 2001
Additional Information
ADDITIONAL INFORMATION
• Date of Birth- 29 Dec 1985
• Marital Status- Single
• Father Name- Mr. Rajender Parashar
• Mother Name- Mrs. Kuntesh Parashar
• Passport No. - G2488077
• Willingness to relocate- Anywhere around the world
Hot Categories
Chemicals
Batteries