Engineer with 21 years experience in oil industry- oil terminal operation, maintenance, safety, training with sap expertise.
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 20 years
Relocation: Yes - Internationally
Career Objective
to utilaise my technical expertise and vast experience in oil industry in oil terminal operaration, maintenance ,training to people, hsse, execution of project work,commissioning of new facilites with sap expertise
Professional Experience
Period : FROM AUG 2007 TO TILL DATE
Designation : TERMINAL MANAGER, RELIANCE INDUSTRIES LTD, HALDIA OIL TERMINAL.
Period : OCT 1997 TO JULY 2007
Designation : DY.MGR OPS I/C/ MANAGER INSTALLATION- m/s bharat petroleum corporation ltd
JOB RESPONSIBILITY:
1. INCHARGE OF FULLY AUTOMATED TERMINAL WITH 1LAC KL STORAGE CAPACITY TO RECEIVE THE PRODUCT THROUGH OCEAN TANKER AND DESPATCH OF FILLED TANKTRUCK THRO AUTO FILLING GANTRY.
ƒÞ TO ENSURE THAT THE FACILITIES ARE CAPABLE OF RECEIVING, STORING AND DELIVERYING PRODUCT IN A COST EFFECTIVE EFFICIENT AND SAFE MANNER WITHIN STANADARD OPERTING PROCEDURE SET BY THE COMPANY TO MEET CUSTOMER SERVICE STANADARD.
ƒÞ PLAN AND MANAGE THE FACILITY WITHIN BUDGETS WITH CONTINIOUS PERFORMANCE IMPROVEMENT.
ƒÞ TO ENSURE EFFICIENT DELIVERY SYSTEM CONSISTENT WITH HSSE POLICES AND STANDARD OPERATING PROCEDURE
ƒÞ TO LEAD MULTIDISCIPLINE WORK FORCE AND TRAIN THEM TO ACHIEVE THE TARGET SET BY COMPANY
ƒÞ TO MAINTAIN AND UPKEEP THE FACILITY LIKE WORKSITE EQUIPMENT&MACHINERY AT HIGH STANDARD THRO PREVENTIVE MAINTENACE MECHANISUM.
ƒÞ TO INCALCULATE SAFE OPERATIG PRODUCRE AND IMPLEMENT THE SAME TO ACHIEVE EXCELLENCE IN OPERATION.
ƒÞ TO IMPLEMENT ALL HSSE AND ROAD SAFETY ACTIVITES IN THE WORKSITE AND ENSURE ALL STATUTORY REQUIREMENT ARE MET THROUGHOUT THE YEAR.
ƒÞ MANAGE WORKSITE PERFORMANCE TO ENSURE PERFORMANCE PERAMETER AND KPI ARE MET
ƒÞ PLAN MANPOWER REQUIREMENT, TRAINI AND MOTIVATE STAFF/CONTRACTOR FOR COMPETENCY, OPTIMUM PRODUCTIVITY.
ƒÞ OPTIMUM UTILAISATION OF FACILITY TO KEEP OPERATING COST AT LOWER LEVEL AND REDUCTION OF PRODUCT LOSSES,
ƒÞ TO HEAD THE TEAM THROUGH VISIONARY LEADER SHIP
Period : FEB 87 TO SEP 1997 Designation: SEO/SOO ,EO -m/s BPCL
AREA OF RESPONSIBILITES:
ƒÞ TO CARRY OUT MAINTENANCE OF COMPANYOWNED TRUCKS, D.G SETS, PUMPS ,WORKSITE FACILITES LOCATED IN DEPOTS/ INSTALLATION AT VARIOUS LOCATION AT EASTERN REGION OF INDIA INCLUDING LUBE OIL BLENDING PLANT
ƒÞ TO DEVELOPE AND IMPLEMENT PREVENTIVE MAINTENANCE SCHEDULE
ƒÞ FINALAISATION OF ANNUAL CONTRACT RATE FOR MAINTENANCE JOB
ƒÞ TRAINING AND DEVELOPMENT TO STAFF/ CONTRACTORS
ƒÞ AS A SAFETY INCHARGE TO CARRYOUT VARIOUS PROGRAMES / TRAINING TO IMPROVE SAFETY AWARENESS
ƒÞ PROCUREMENT AND TENDERING AND EXECUTION OF CONTRACT FOR ALL MAITENANCE JOB.
ƒÞ COMMISSIONING OF NEW FACILITIES
Eductation
B.SC (CHEMISTRY) Madurai Kamaraj University 1981
B.TECH(Automobile Engg) MECH. ENGG- Madras Institute of technology/Anna University 1984
Certification
sap
1.ATTEND END USER TRAINING ,SAP LOCATION ANCHOR TRAINING LEVEL1 AND LEVEL2 AND OBTAINED COMPEYTENCY CERTIFICATE
ƒÞ AFTER ATTAINING PROFICENCY IN SAP UNDERWENT AS A ROLLOUT MEMBER FOR SD MODULE IN SAP IMPLEMENTATED LOCATION.
ƒÞ AS A LEVEL 2 MEMBER ABLE TO RECTIFY SAP PROBLEM OF NEAR BY LOCATION
Additional Information
UNDERWENT TRAINING
1 INTENSIVE OPRATIN COURSE 4WEEKS SEWREE TRAINING
CENTRE
2 HAZOP STUDIES 3 DAYS CLRI,ADAYAR,CHENNAI
3 BASIC COMPUTER TRAINING 10 DAYS APPLE INSTITUTE,
CALCUTTA
4 SAP LOCATION ANCHOR TRANING 12 DAYS BPTC,JUHU
MUMBAI
5. SAP END USER TRAINING 12 DAYS CHENNAI R.O
6. SAP LEVEL 2 TRAINING 6 DAYS BPTC,MUMBAI
7 FIRST AID COURSE 4 DAYS BANGALORE
8 PERSONAL EFFECTIVENESS 3 DAYS BHUBANESHWAR
9 TRAINERS TRAINING OF HAZAROUS
GOODS TRANSPORTATION 3DAYS BUDGE BUDGE
INSTALLATION
10 TEAM BUILDING 3 DAYS CALCUTTA R.O
ƒÞ OTHER ACHIEVMENTS
. AS A INCHARGE OF IRUGUR TOP INSTALLATION,THE INSTALLATION AUTOMATION SYSTEM MAINTAINED AT HIGH STANDARD LEVEL WHICH WERE APPRECIATED BY VISITING OFFICIAL.
-. AS AN INCHARGE OF FIRST MODEL LOCATION IN BPCL, HIGH SAFETY STANDARD AND OPERATION EFFCIENCY WERE MAINTAINED THROUGHOUT THE PERIOD.
-..5LT TIN FILLING MACHINE WHICH WAS IDLING AT BUDGE BUDGE LUB PLANT WAS MODIFIED FOR PLASTIC FILLING WITH LOCAL SOURCE
AVAILABLE AND COMMISSIONED THE MACHINE AND INCREASED THE
PRODUCTION WHICH WAS APPRECIATED BY THEN DIRECTOR MARKETING
ALONG WITH A MEDAL.
Hot Categories
Chemicals
Batteries