Egypt Zones accountACCOUNT

Sultan Sikander Khan- M.Sc - Petroleum Engineer


This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription. Go to Recruitment Products >>
Education: 5
Experience: 0 years
Relocation: Yes - Domestically

Industry Experience
0 years Engineering - Petroleum

Career Objective

To learn and serve, as Petroleum trainee engineer, in an organization that offers a stimulating culture of learning, an environment that motivates individuals to channelize their capabilities and achieve both personal and corporate growth.

Professional Experience

„« Worked as an internee for five weeks under the professional environment provided by OGDCL PAKISTAN at Fimkassar oil field.

During my internship
„« I have observed various wells in that area.
„« I have observed X-mass Tree and wellhead assemblies of different wells
like Fimkassar wells, Chak Norang wells.
„« I have also visited wells operating on artificial lift
(Suckor Rod Pump) and on Secondary Recovery (water is injecting into
the reservoir), learnt ideas about different Artificial Lift Methods
and Secondary Recovery Techniques.
„« I can efficiently design SUCKOR ROD as well as GAS LIFT POWER
requirements and GAS LIFT VALVES Design.

Eductation

M.Sc Engineering U.E.T.Lahore Petroleum & Gas Engineering 80% 2009
B. Sc. Engineering U.E.T.Lahore Petroleum & Gas Engineering 78 % 2007
F. Sc. Govt. Collage Layyah Pre-Engineering 77 % 2003
Matriculation Govt. Model High School Science Group 81% 2000

Additional Information

Under Graduate Project:

SAND CONTROL TECHNIQUES
TOPICS INCLUDED ARE,
„« How Sand problem starts & what are its effects
„« How sand production is detected
„« How we can control this major problem by Gravel Packing and by
injecting different chemicals (Plastic Consolidation).
„« In Gravel Packing how Gravels are designed and about Gravel Pack
assembly

Presentations:
„« PRESURRE BUILD UP & DRAWDOWN TESTS
„« CASING DESIGN
„« WELL STIMULATION
„« SUCKOR ROD DESIGNING
„« GAS LIFT DESIGNING
„« PLT
„« HIGH PRESSURE GAS RESERVOIRS.
„« ROLE OF CAPILLERY PRESSURE IN A RESERVOIR
„« TUBING COMPONENTS AND ITS FAILURE (LEAKS,CORROSION)
„« CORROSION CONTROL TECHNIQUES.


Hot Categories

Chemicals Batteries

Are you Hiring?


Reach the right candidates to fill your technical positions with Gulfoilandgas Jobs »
Technical Recruitment
Our Career Center has 70,000+ resumes for employers to search »
700-Petroleum and Geology Camp Building » News » Cleaning Equipment, Services » News » Communication » News » Construction Contractors » News » Corrosion Products/Services » News » Diving Contractors » News » Exploration » News » Food Supplies » News » Labor Services » News » Land & Leasing » News » Maintenance and Repair » News » Offshore/Onshore Construction » News » Oil & Gas Companies » News » Oil Field Services » News » Pipeline Services » News » Safety Services » News » Service Companies » News » Skilled Labors » News » Subsea Production » News » Transportation, 4X4 Trucks » News » Unskilled Labors » News » Utility Systems » News » Waste Disposal » News » Water Supply Services » News » Welding Products/Services » News »
Engineer
Mechanical Engineer
Field Engineer
Quality Control/Quality Assurance Engineer
Environmental Health & Safety Associate
Engineering
Technician
Electrical Engineer
Engineering
Petroleum

Field Service Technician
Manager
Information Systems/Technology
Electrical/Mechanical/Structural
Construction Engineer
Civil Engineer
Assistant Manager
Purchasing Management
Chemical Engineer
Project Engineer
Analyst
Engineering
Drilling

Customer Service
Process Engineer
Control Engineer
Project Manager
Electrician
Computer Systems Analyst
Engineering Management
Operations Manager
Specialist
Marketing/Sales Manager
Sales
Construction Technician
Mechanic
Plant Engineer
Driller
Consulting Engineer
Maintenance Manager
Other
Egypt Zones
Copyright © Universal Solutions All rights reserved. - Privacy Policy.