Instrument & Electrical Supervizor
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 3
Experience: 20 years
Relocation: Yes - Internationally
Career Objective
I grew up and studied in the Ceyhan-Turkey which one of them energy central in the world of the petrol and gas. I speak, Turkish, English, fluentl, german basic.
I’ve been working electric and instrument field, over than 25.
Professional Experience
August 2008 Ongoing: Ruwais 3rd NGL Train Project Business Unit Onshore
Snamprogetti Centre of Excellence Saipem S.p.A
Position: Electric and Instrument supervisor
Responsibilities
Re-design all Communications Systems according to vendor documentation and system needs like as MCR and DCS, CCTV, Access Security System PA, Radio, LAN and voice Systems, and supervision the Fire and Gas System...
My secondary responsible are helping to two junior supervisors whose are supervision to installation the ROTORK field bus system and All Analyzer transmitters and shelters too.
And future duties are planning and managing to I/O and loop tests and to guidance to the commissioning teams.
August 2006 to Date May 2007: M/s. TEKFEN CRUDE OIL EXP.FACILITY, Kuwait in 2007.
Position: Electric and Instrument supervisor
Responsibilities
Organize and supervise the works of the electrical and instrument supervisors. And checking all progress with together piping and civil grub and create a new work plan weekly if there is any problem. And preparing the all electrical and Instrument systems for test and loop-check reports with QA/CQ department, working with the pre-commissioning team. Preparing daily reports for the Electrical Superintendent of the area.
October 2005 to June 2006: (TCO) RAFINERY SECOND GENERATION PROJECT
(BECHTEL-ENKA JOINT VENTURE)
Position: Electric and Instrument supervisor
Responsibilities
I was responsibility all electric and instrument installation. Its called Gas area one of the big part of Second Generation TCO Asset Development Projects Sulphur Recovery Unit. Follow up the systems needs and material from BOM list which is preparing main Contractor the Flour Daniel (PFD) and checking all project material and inform the authorise person. Keep trek of all as built and documents planning of works and inform planning group for up dates.
October 2002 to October 2004: Siemens AG. 1210 MW (2 x 605 MW) coal-fired. power station
Iskenderun-Turkey
Position Heavy Construction works Supervisor
Responsibilities
My Primary responsibility was installation to 2x 605 NVA High Voltage Power Transformers. Bus duct and I managed the technical contact with the vendor supervisors.
Eductation
1980 – 1983 Industrial Technical High School Diplomas
1989 – 2009 Specialist Diplomas of Maintenance in the machine
1999 – 2009 Specialist Diplomas of HVAC and Refrigeration Systems
2007 Ongoing Junior College / Mechatronics (Distance Learning)
2007 German Basic Course (3 Months) Berlitz - Wiesbaden Germany
2002 Language Studies International- Brighton, UK
Intermediate Certificate (3 Months)
Certification
• Professional & fast Electrical and Instrument design.
• Auto Cad and All MS Office application,
• UL, BS, VDE, TSE standards, HS & QA/QC Procedure
• Technical Planning, Cost Control, logistics operation and monitoring of large projects
Additional Information
Cinema, bridge, music, computer science; I enjoy cycling and the outdoors
I possess a full car and motorbike driving license.
Hot Categories
Chemicals
Batteries