Control Room Engineer for 1220 Mw Power Plant , Paiton, East Java, Indonesia
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 10 years
Relocation: Yes - Internationally
Career Objective
Responsible for continuous control of all activities associated with both unit 5 and unit 6 (Boiler turbine) and ancillary plant (Water treatment, Waste Water treatment, Electro Clorination Plant, Hydrogen Plant, some of Coal Plant area)
Professional Experience
December 2007-May 2008
On El Kureimat Egypt, Combined cycle steam power station Module 1, 750 Mw, with 2x250 Mw SIEMENS gast turbine & 1x250 Steam turbine. As SIEMENS shift charge, responsible for commissioning Start up & shut down Gas turbine open cycle 2xV94.3 with gas as main fuel. Also responsible for all Ancillary plant (Gas Supply, Fire protection)
September -November, 2005
On Az Zour South Power Station Kuwait with 8 x 125 Mw, SIEMENS project. As SIEMENS shift charge, responsible for commissioning Start up & shut down Gas turbine open cycle 8xV94.2 with oil & gas as main fuel. Also responsible for all Ancillary plant (HVAC, Fuel & Gas Supply, Fire protection)
March – Mei 2005
1 month Training and 1 month joint to shift On YTL Paka Terengganu Malaysia, 2 x V94.2 Two Gas turbine + one steam turbine combined cycle power Plant, 2 x 375 Mw. The Training material is including start up & shut down of Combined Cycle Power Plant, also joint interaction of some trouble shooting during joint the shift.
Eductation
Brawijaya University, Mechanical Engineering Department, Majoring in Conversion Energy, with GPA 2.99.
Certification
a. Gas Turbine opens cycle SIEMENS series V94. 2, including start up & shut down, GT controller & instrumentation, Fuel & oil gas system of gas turbine and lubrication system.
b.Combustion Efficiency “Cost saving and Reduction trough Combustion
Efficiency Improvement Combustion fundamental, Fuel firing systems, Coal Fired Burner, Burner Safety Code (NFPA), Combustion Product, Combustion Optimization.
c. Government statutory for unit competency level 3 on operating
large power plants.The Indonesian Power Engineers Association: IATKI) Accredited by Director General of Electricity and Energy Utilization, Department of Energy and Mineral Resources Of the Republic of Indonesia.
d. SIEMENS Teleperm XP. Automatic systems AS620, Operation and monitoring systems OM650, Engineering systems ES680, Bus systems (LAN), I&C documentation, working with TELEPERM XP documentation.
Hot Categories