Sr.Construction Engineer/ Co-ordination Engineer.
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 20 years
Relocation: Yes - Internationally
Career Objective
Construction engineer mainly responsible for day to day activities relating to Safety, Quality and Speed.Timely Completion of Project without Cost overruns.
Professional Experience
7. Proficient Experience : Presently working in Kuwait in Joint Operations work for Main gathering centre in oil exploration, as Sr. Construction Engineer from May 2008.
March2007---April 2008.
M/s Unity Infraprojects Pvt Ltd, Mumbai, Joined on March 2007, as Sr Manager, Looking after International Infrastructure Works. (U.A.E., Yemen, Oman, Sri-Lanka.)Works Executed are Asphalt and Concrete Roads, Micro-Tunneling, Multistoried Buildings, Real Estates.
MARCH 2007 TO JUNE 1992, IN KONKAN RAILWAY CORPORATION LTD, OF MINISTRY OF RAILWAYS, GOVT OF INDIA.
Year 2004 – 2007 : ‘Resident Engineer’, Sky Bus Metro, Goa of Konkan Railway Corporation Of Ministry Of Railways, Govt. Of India.
• In-charge of World’s first Construction of Test Tack of Sky Bus Metro at Madgaon, Goa.
Fully responsible for progress & quality of
Work. The work of 1.6 km test Track - was
completed in all respect in a record time of 7-
Working months.
Year 2002 – 2004 : Senior Project Engineer of Project Division at Corporate Office
• Associated with the Construction of Prototype of Sky Bus Metro at Margao, Goa, India.
• Associated with the Survey Work in Jammu Kashmir for the new Railway Line – which included 47 large tunnels and 51 Major Bridges in a stretch of 120 km. Cost 7000CR.
• Associated with the works for finalization of Firms for Construction & Consultancy Firms for Jammu-Kashmir Railway Line Project.
Year 2000-2002 : Resident Engineer – in the Construction of Owk Tunnel Project, an Irrigation Tunnel financed by World Bank, Work entrusted to Konkan Railway Project Division, by World Bank. The Work completed in a record time of 18 months.
• This works was inclusive of – Initial Survey & Geological Investigations Study. I was solely responsible for Accuracy of Works. Construction of our Tunnel, is a 2.0 km long tunnel, was Horse –Shoe Shape with a total C.S. Area of 41.05 m2.
Eductation
Bachelor Of Civil Engineering 1989.
Hot Categories
Chemicals
Batteries