welding / coating inspector
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 3
Experience: 8 years
Relocation: Yes - Internationally
Career Objective
I have working experience in refineries, Petro-Chemical Plants, Tank Farms, and Bottling Plants in Mech Fab, welding, Erection, Testing Painting Inspection of Pressure vessels,storage tanks, Piping & Structural.
Professional Experience
„X Construction of 3X 1000 MT Capacity Mounted pressure vessels for LPG Storage at HPCL (Hindustan Petroleum Corporation Ltd), Loni, Ghaziabad, Uttar Pradesh, India.
„X Construction of 4X 800 MT Capacity Mounted pressure vessels for LPG Storage at IOCL (Indian Oil Corporation Ltd), Amousi, Lucknow, Uttar Pradesh, India.
„X Fabrication of Oil storage tanks for Kenya Pipeline Company (KPC) the projects done at Taloja Fabrication Workshop, Raigad Dist, Mumbai, Maharastra, India.
„X Construction of double deck floating roof (DDFR) tanks for Oil storage, cone roof (CR) tanks for Firefighting water storage and Heavy Structures at Multi Purpose Chemical Terminal in Reliance Engineering Associates (Pvt) Ltd, Rewari, Haryana, India.
„X Construction of Stainless Steel DEA Regenerator Columns for Ruwais Fertilizer Plant, Abu Dhabi, UAE. The job done at Vijay Tanks & Vessels Ltd¡¦s (Export Division) Fabrication workshop, Gandhidham, Gujarat, India
„X Construction of Gas Boot and Fabrication of oil storage tanks for Shell International Exploration and Production BV. The job done at Vijay Tanks & Vessels Ltd¡¦s (Export Division) Fabrication workshop, Gandhidham, Gujarat, India
„X Construction of Fuel oil storage tanks for western Mountain Project, Libya Electrical Company, Libya. The job done at Vijay Tanks & Vessels Ltd¡¦s (Export Division) Fabrication workshop, Gandhidham, Gujarat, India
„X Fabrication of Pipe Spools for Burrup Fertilizers Projects (2200 MT Capacity Ammonia Capacity Plant) ¡V 90,000¡¨ Dia. The job done at Vijay Tanks & Vessels Ltd¡¦s (Export Division) Fabrication workshop, Gandhidham, Gujarat, India
„X Construction of crude oil storage tanks, piping projects, related facilities and Shutdown jobs for tank farm Up gradation works on tank farm Phase- II at Qatar Petroleum (QP), Mesaieed Industrial City, Ummsaid, Qatar.
„X We are working under the main contractor: Chiyoda ¡V Technip JV for Fabrication & Installation of Crude Oil Storage tanks, Pipe support structural for Expansion of Unit III & IV at Ras laffan olefin project, Ras Laffan Industrial City, Ras Laffan, Qatar.
Eductation
Three-years course of Diploma in Mechanical Engineering from TamilNadu State Board of Technical Education on St. Xavier¡¦s Polytechnic at seydunganullur,Tamilnadu, India Completed on April 2000.
Certification
CSWIP 3.1 Welding Inspector
NACE CIP 1 Coating Inspector
ASNT Level II in Ultrasonic Testing
ASNT Level II in Magnetic Particle Testing
ASNT Level II in Dye Penetrant Testing
ASNT Level II in Radiographic Testing
Additional Information
Prepare the step wise inspection and testing reports as per Approved Quality Assurance Plan, Specifications, and procedures.Maintain the Calibration certificates for Machineries and Inspection Instruments and Test Certificates for Raw Materials, Consumables, etc.,Maintain the Documents Such as Specifications,Codes, National & international standards, Procedures, Quality Assurance Plan, etc.,Monitoring the Performance Qualification tests for the welder and welding operators as per the Welding Procedure Specifications
Execution of all intermediate and final dimensional inspection in construction sites and Fabrication Shops as per the requirement of the Approved Drawings and Approved quality assurance plan.Making Proper decisions regarding dimensional tolerances as per codes, drawings, standards, and client¡¦s specifications.Proper execution of plates cutting, Rolling, Pressing, Fit-up, Welding as per approved drawings, codes, standards & clients specifications.
Ability to face the problem in different types of welding processes like SMAW (MMA), TIG (GTAW), MIG (GMAW), FCAW, and SAW.Safe and perfect execution of Pneumatic testing for RF Pads and Hydro testing of tanks, pressure vessels, pipelines, as per Approved procedures, Drawings, Codes, Quality Assurance Plan (QAP).I well conversant with international codes and standards like ASME Sec II Part A & C, ASME Sec IX, ASME Sec VIII Div I & II, ASME B 31.3, API 650, API 620, BS5500, API 653, API1104.
Hot Categories
Chemicals
Batteries