Project Manager
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 20 years
Relocation: Yes - Internationally
Industry Experience |
20+ years |
|
Manager |
Career Objective
-
Professional Experience
C.V
Name: Aziz Ayaz
Education: Middle East Technical University, Ankara-Turkey
Professinal: B.Sc. in Chemical Engineering
2008-2009 Project Manager, Lotus Enerji-Turkmenistan
Construction of DCU and SDA Units in Turkmenbasi Refinery on Turn-key
Basis Contract, 200 mln Euro budget.
2007 -2008 Technical Consultant – Razi Petrochemical Complex / Iran
Consultancy services for a complex consists of natural gas treatment, granul sulphure, ammonia, urea, phosphoric/sulphuric acids production plants, power generation, water treatment etc.
2007 Project Manager-Gap Insaat A.S./(Calik Holding)
Civil, mechanical, electrical and instrumental construction work of Onshore Gas Terminal Project Plant (OGT) to be built in Turkmenbashi, Turkmenistan by
Petronas, Malaysia.
2006 -2007 Industrial Projects Development Mng. - Gap Insaat A.S. / (Calik Holding)
Bussiness development, feasibility study, project investment evaluation, bidding for petrochemical complex, fertilizer plant, refinery, desalination plant.
2001-2006 Project Manager – Gap Insaat A.S. / (Calik Holding)
Process development, engineering, procurement, erection, construction , commissioning and start up of an ammonia and urea plant in Tecen-Turkmenistan on lump – sum basis based on natural gas feedstock and fuel with total project budget of 240 mln USD. The facility, besides various chemical processes, includes gas prufication ,compression, conversion, steam and electrical power generation , nitrogen production, water treatment etc.
1990-2001 Production Manager – Ammonia&Urea complex, Igsas, Turkey
Mangement of an ammonia and urea plant production based on natural gas, planning the production, optimization of processes, apply the necessary modification and rewamp projects for new technology, improve the production, reduce the energy consumption, monitoring the product quality, plant safety etc.
1990-2001 Production Superintendent – Ammonia&Urea Complex, Igsas,Turkey
1978-1990 Process Chief Engineer – Igsas
1976-1978 Project Engineer – Azot Sanayii A.S.
Engineering and procurement service in construction of an ammonia plant in Gemlik,Turkey.