DEEE. WITH 17 YEARS OF EXP. IN ERECTION / MAINTENANCE / UTILITY / PETROCHEMICAL / POWER PLANT
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 17 years
Relocation: Yes - Internationally
Career Objective
To pursue a responsible motivating career that provide me an opportunity to Improve efficiency to perform quality of work for your esteemed organization
Professional Experience
Work Experience:
Erection and maintenance of:
• 5.3 MW Caterpillar make HFO based captive power plant.
• Various types of circuit breakers like 132 KV,1250 A Crompton Greaves make SF6 CB, 11 KV 600/ 150 A Siemens make Vacuum CB,LT breakers up to 4000 A of make EE, L&T.
• Transformers: 132 / 11 KV, 8 / 10 MVA , Crompton Greaves make with OLTC.
11 / 0.433 KV , 2 MVA Crompton Greaves make with OLTC,
• 1750 KVA ‘Detroit’ make high speed DG set.
• Dyno-drive, VS-Drive
• Maintenance of various MCC’s and PCC’s including DOL , Star / Delta and auto transformer starters up to 500 KW.
• Various utility equipments like:-
• ‘Voltas’ make 700 TR centrifugal chiller.
• K.G.Khosla make reciprocating air compressors.
• ‘Thermax’ make 7 Ton / Hr boilers.
• “PSI’ make N2,H2 and O2 gas plant.
• ‘Thermax’ make 1500000 Kcal / hr hot water generator.
• ‘Thermax’ make Waste Heat Recovery Unit.
• Also looking after operations of borewells
• Installation, Testing and commissioning of various Electrical equipments like 500 KVA 440 / 200 V Transformers, PCC’s and other electrical utility equipments.
INSTRUMENTATION
• Maintenance of Instrumentation like calibration,repairing,troubleshooting,testing of electronic & mechanical instruments.
• 1)Handling of Control valves make;Masoneilon, ABB,Honeywell etc.,
• 2)All types of Flow transmitters, Flow controllers, Flow switches etc.,
• 3)Pressure gauges, Pressure Transmitters, pressure controllers, pressure switches etc.,
• 4)Temperature elements, RTD, Temperature controllers, Temperature switches etc.,
• 5)Analysers like Detectors of Chlorine,H2S,DM water samples etc.,
• 6)Attended commissioning of Instrument panels & local panels
• 7)Knowledge of DCS tecknology
• 8)Worked in stand alone controllers of pressure,temperature & flow.
WORK RESPONSIBILITY:
• To carry out scheduled preventive maintenance, Breakdown maintenance and predictive maintenance.
• To carry out root cause analysis of breakdowns and to take necessary action to prevent repeat again.
• Daily job distribution to technicians.
• To ensure safe working practices to prevent damage to production / manpower.
• To improve the system as per ISO 9000 / 14000 and ‘5S’.
• To deal with GEB and other Govt. authorities like Electrical Insp., Duty Insp. Etc..
Eductation
Academic Profile :
NAME OF THE UNIVERSITY NAME OF COURSE YEAR OF PASS
ANNAMALI UNIVERSITY B.SC-MATHS 2002
TECHNICAL QUALIFICATION :
NAME OF THE UNIVERSITY NAME OF COURSE YEAR OF PASS % MARKS
BOARD OF TECHNICAL EDUCATION,
TAMILNADU GOVERNMENT DIPLOMA IN ELECTRICAL & ELECTRONICS ENGINEERING 1990 66%
ADDITIONAL QALIFICATION :
NANE OF INSTITUDE NAME OF COURSE YEAR OF PASS
BOARD OF LICENCE
TAMILNADU GOVERNMENT SUPERVISOR COMPATENCE CERTIFICATE
( C- LICENCE)
INSTITUTE OF COMPUTER TECHNOLOGY DIPLOMA IN COMPUTER APPLICATION 2004
INDIAN INSTITUDE OF HARDWARE TECHNOLOGY A+ (DIPLOMA IN COMPUTER HARDWARE) 2005
MADRAS PRODUCTIVITY COUNSILE ELECTRICAL SAFETY CERTIFICATE 2005
USHA FIRE SERVICE SAFETY CERTIFICATE 2006
Certification
TECHNICAL QUALIFICATION :
NAME OF THE UNIVERSITY NAME OF COURSE YEAR OF PASS % MARKS
BOARD OF TECHNICAL EDUCATION,
TAMILNADU GOVERNMENT DIPLOMA IN ELECTRICAL & ELECTRONICS ENGINEERING 1990 66%
ADDITIONAL QALIFICATION :
NANE OF INSTITUDE NAME OF COURSE YEAR OF PASS
BOARD OF LICENCE
TAMILNADU GOVERNMENT SUPERVISOR COMPATENCE CERTIFICATE
( C- LICENCE)
INSTITUTE OF COMPUTER TECHNOLOGY DIPLOMA IN COMPUTER APPLICATION 2004
INDIAN INSTITUDE OF HARDWARE TECHNOLOGY A+ (DIPLOMA IN COMPUTER HARDWARE) 2005
MADRAS PRODUCTIVITY COUNSILE ELECTRICAL SAFETY CERTIFICATE 2005
USHA FIRE SERVICE SAFETY CERTIFICATE 2006
Additional Information
i have completed BE-EEE in Vinayaga university and waiting for result
Hot Categories
Chemicals
Batteries