CSWIP 3.1 Welding Inspector with 5 Years of Experience
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 5 years
Relocation: Yes - Internationally
Career Objective
Aspiring a Rewarding Career in an esteem Organization
Professional Experience
TATA PROJECTS LIMITED (AHMEDABAD) July’2006-Till date
Responsibilities:
• Third party inspection at various places
• PDO (Petroleum Development Authority of Oman) Approved Cross country pipeline inspector.
• API 5L pipes Inspection.
• Inspection of evaporator, pressure vessels, heat exchanger, skids.
• Structural fabrication, casting inspection.
• Wind mill casting assembly and WTG Casting Inspection.
• Painting inspection , WPS PQR and Welder qualification
• Desk expediting work at Bechtel Delhi (3 Months)
ABROAD EXPERIENCE
LOCATION – South Korea.
Client: - PETROFAC INTERNATION LTD. SHARJAH
Vendor: - Zeeco USA/ Samshin Industries.
Project: In Salah Gas Compression.
Item: - Flare Stacks
Code of Construction: ASME SECVIII DIV I ED 2007.
MATERIAL: SA 537 CL 1, SA240 TP 316L
Duration: 2 Months
LOCATION – Tunisia
Client: - PETROFAC INTERNATION LTD. SHARJAH
Vendor: - Hamon France/ SCIN Works.
Project: In Salah Gas Compression.
Item: Air Cooled Heat Exchanger
Code of Construction: API 661 6TH Edition February 2006.
MATERIAL: SA240 UNS 31803
Duration: 2 Months
Gala Precision Technology Limited (waghodia)May”2005-June-2006
Responsibilities:
• Preparation of Quality control plan &procedures.
• Job stage inspection (from receipt of material to hydro test & painting)
• Co-ordination with third party inspectors & the client.
• Maintaining Good working practices during fabrication activities.
• Final inspection clearance of job from third party like BVIS, EIL,CEIL,SGS ETC.
Larsen & Toubro Limited (Hazira Works)OCT” 2003-May”2005
Responsibilities:
JOBS HANDLED
• SIDEM – RAS AL KHAIMAH
Client: - SIDEM – Paris France.
Fabrication of Evaporators, condensers, ejecto-compressors, Nozzles for water desalination plant, TPI BVIS
MATERIAL: SA240 TP 316L
• SIDEM – MOBIN
Client: - SIDEM – Paris France.
Fabrication of Evaporators, condensers, ejecto-compressors, Nozzles for water desalination plant, TPI BVIS
• 9WPP- PROCESS PLATFORM
Client: - ONGC.
Process piping of oil platform, from spool mfg to hydro test and final painting of piping. TPI
Materials: SA 106 GR B, NACE, SA 240 316L, 304
1) Sidem, Ras All Khaimah.
2) Sidem, Mobin.
3) Oil & Natural Gas Commission
Worked as Executive QA/QC for Desalination plant, offshore module Projects.
Eductation
Academic Qualification:
B.E. in Production engineering with 1st class from Sardar Patel University. V.V. NAGAR. During 2000-2003 JULY
Diploma in Fabrication Technology with 1st class Distinction from BPI bhavnagarDuring 1996-1999 OCT
Certification
CSWIP 3.1 (welding inspector), ASNT Level II in MT, PT, RT & UT.
Hot Categories
Chemicals
Batteries