Resume for Eng. Md. Matiar Rahman
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 14 years
Relocation: Yes - Internationally
Career Objective
To establish my career in a reputed and dynamic organization that is target oriented, challenging and where performance is continuously evaluated and rewarded.
Professional Experience
WORK HISTORY No.3
Period 13 April 1998o till date
Organization Maddhapara Granite Mining Company Ltd. A Company of Bangladesh Oil, Gas and Mineral Corporation (PETROBANGLA). Maddhapara, Phulbari, Dinajpur, BANGLADESH.
Position Manager (Hoisting and Transportation)
Duties Operation, maintenance and repair of main and auxiliary hoisting equipments, shaft tower and shaft outfitting, shaft bottom pumps, Rock Breaker, etc.
Operation, maintenance and repair of underground haulage equipments such as electric locomotive, 2t & 5t class mine cars, etc.
Maintenance and repair of underground mine machinery such as air-loader, drilling equipments (Altas Copco SIMBA JUNIOR, Jack hammer, etc), compressed air and water pipeline network, mine de-watering pump, etc.
Preparation of preventive maintenance schedule, annual budget, essential consumables, spare parts, etc.
Controlling of manpower, office corresponding works, etc.
Reviewing of engineering design documents, technical explanation & calculations of various systems required for development of underground mining project.
Keeping close liaison with supervisory consultancy firm and project implementing contractor regarding technical maters, works plan, unanticipated technical issues, physical and financial progress of the project, etc.
Supervision and monitoring of mine construction works (underground roadway, crossing, raise, stopes, etc), installation works such as hoisting plant, crushing & sorting plant, air compressor plant, standby diesel power plant, underground mine de-watering pumps, air & water pipeline networks, railway networks, etc.
Record keeping and evaluation of all temporary and permanent equipment & machinery, consumable, wearable and disposable materials, tools & special tools, spare parts, etc.
Maintenance and repair of vehicles, workshop equipment, pumps, pipe networks, etc.
WORK HISTORY No.02
Period 04 April 1997 to 12 April 1998
Organization Karnophully Papers Mills Ltd. An Enterprise of Bangladesh Chemical Industries Corporation (BCIC).
WORK HISTORY No.01
Period 15 June 1996 to 3 April 1997
Organization Coats Bangladesh Ltd. A member of the Coats Viyella groups
Eductation
Bachelor of Science in Engineering Mechanical)
Name of the institute : Khulna University of Engineering & Technology (KUET), BANGLADESH.
Period attendant from : 1988 to 1993 (4 years regular)
Date of passing the exam. : 14 November 1993
Class obtained : 1st class
Merit position in the class : Second
Marks obtained : 3.24 CGPA
Higher Secondary Certificate (Science Group)
Name of the institution : Mohipur Haji Mohsin Government College
Period attendant : From 1986 to 1997 (2 years regular)
Month of exam. held : In June ~ July 1987
Place obtained : 1st division
Secondary School Certificate (Science Group)
Name of the institution : Dharanjee Kutobia Bi-lateral High School
Period attendant : From 1981 to 1985 (5 years regular)
Month of exam. Held : In April ~ May 1985
Place obtained : 1st division
Primary education
Name of the institution : Dharanjee Primary School
Period attendant : From 1976 ~ 1980 (5 years regular)
Certification
Special achievement Acknowledged a thanks letter from Maddhapara Hard Rock Mining Project (MHMP) authority for accurate, significant and distinctive technical assistance on various mining development works, reviewing of technical design-documents, assessment of overall physical & financial progress of the project, computerization of various technical data, explanation, calculation etc.
Enriched myself receiving an appreciation letter from mother organization Bangladesh Oil, Gas & Mineral Corporation (Petrobangla) for remarkable contribution to prepare actual investment & re-payment schedule made by the Contractor for development of Maddhapara Hard Rock Mining Project against US$158.00 million.
Additional Information
TRAINING
Foreign Training
Period 10 February to 8 March 2005
Organization Grupa EKs Polska (Poland)
Title Training on Operation & Maintenance (O&M) of Maddhapara Hard Rock Mining Project.
Local Training
Period 28 March to 03 April 2006
Organization Training Institute for Chemical Industries (TICI), Bangladesh.
Title Plant Operation & Maintenance
Period 15 to 21 April 2001
Organization Institution of Engineers, Bangladesh (IEB)
Title Safety Management
Period 19 to 24 April 2008
Organization Engineering Staff Collage, Bangladesh
Title Public Procurement under Public Procurement Act 2006 & Regulation 2008
Hot Categories
Chemicals
Batteries