MAINTENANCE COMMISSIONING TEAM LEADER INSTRUMENTATION SUPERVISOR
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 5
Experience: 31 years
Relocation: Yes - Internationally
Career Objective
To secure an internship with a progressive Organization and a passion for pursuing career using my analytical skill and commitment to perform quality work.
Professional Experience
32 years’ experience (21yrIndia+11yrGulf) in instrumentation includes Key Skills: includes Oil & Gas ,LNG, Fertilizers, Power Plants, Power co-gen erection in sugar mills, and Construction, erection, calibration hookup & trouble shoot, Routine PPM jobs, scheduling, planning Commissioning / maintenance with OIL& GAS Projects of ADGAS LIQUEFACATION CO.LTD.in UAE.
M/s Rana Sugars Ltd. As a Senior Manager (I&C)
M/s Uttam Sugar Mills LTD. as Instrumentation Manager,
M/s ALPHA Control Instruments Pvt. Ltd LUCKNOW Project Manager,
M/S Duncan Industries Ltd Panki, Kanpur, as Technical Consultant.
PDO Oman-Gal far contracting. & Engg. Co. Llc, as Sr. Instrument eff.line supervisor.
Ras Laffan Liquefied Natural Gas Company Ltd. As foreman- Onshore Doha-Qatar.
M/S ICI INDIA Ltd. And M/S Duncan Industries Ltd. (fertilizers division Kanpur, India)as senior Instrument Technician
OIL&GAS Project -UAE (Nov-2008 to March 2016) Instrument Supervisor(Project) and Material Review Instrument-Technical Data Specialist Engineer.
Review of the engineering package submitted by the EPC Contractors & SAP Material review of SPIR which is ending in March 2016.
Review of instrument installation drawings submitted by EPC Contractors before installations.
Conduct site surveys of existing facilities to establish and identify the actual requirements.
Site supervision for instrument related works.
Co-ordination between discipline supervisors and EPC contractors during installations, testing and commissioning.
Conduct/attend project progress review meeting at site.
Witness review and approve site testing / commissioning reports.
Provide technical support on all engineering aspects arising from Instrumentation discipline during the construction phase of the projects.
•Planning day to day maintenance of interlock/logic & control equipment.
• Supervise all work on instrumentation & control system.
• Uphold company HSE standards.
• Supervise activities of assigned personnel & jobs.
• Managing the shift personnel.
Eductation
Academic : M.sc (physics) electronics main 1st division(1987-89)
B.sc (physics) 1st division.(1987)
Technical : Grade IETE section A (Control/Instrumentation)
under progress
Passed N.C.T.V.T. Certificate. 1stdivision.
Apprentice : Completed 3 years trade apprentice(1980-1983)
In instrumentation from ICI INDIA
(Fertilizers Business Area) Panki, Kanpur (India).
Certification
Triconex implementation and maintenace-msw for Esd system .Salem automation ltd uk fire and gas protection system maintenance.
Thron security ltd uk hard ware and software trainings for Minerva administrator level, & consys configuration program version.12 operation maintenance of the thron fire alarm. Minerva analog addressable system on line
Gc-1000 operation and maintenance & process analyzer sampling system.
Introduction to ISO 9001 and quality management course.
First aid and rescue courses.
Sap plant maintenance & micro soft office courses.
Appreciation in electronics ati-epi Dehradoon.
Micro processor based process control system ati-epi, Hyderabad.
Additional Information
Independently executing the Instrumentation constructions pre-commissioning & commissioning work for Petroleum Development Oman south/north Oman oil/gas fields.
1. Involved in successful errection, commissioning of five types of microprocessor based fire & gas protection systems for LNG plants and ras gas on-shore buildings.
2. Involved in successful erection and commissioning of 31.5 mw gas turbine generator/ 145 tones/hr heat recovery steam generation unit & 12.5 mw power plants.
3. Successful commissioning of Foxboro dcs for lng, yokogawa blue star Dcs effluent treatment and imparted training to all technicians of instrument section and operational staff including contractor’s staff.
4. Installation of electronic weighing machines for packing plant.
5. Installation of PLC in packing plant for sequential running of weighing
Hot Categories
Chemicals
Batteries