Mechanical Engineer
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 3 years
Relocation: Yes - Internationally
Career Objective
Eager to acquire a challenging position in the esteemed organization as a professional engineer equipped with strong technical & interpersonal skills and an overriding commitment to safety and environmental responsibility.
Professional Experience
• Mari Gas Company Limited Daharki, Distt. Ghotaki Sindh.
(Assistant Mechanical Engineer)
• Planning on Primavera Project Planner
• Involved in installation of well head facilities, pipeline gathering system & 125 MMSCF dehydration plant for supply of gas to power plants.
• Involved in installation of SCADA system i.e. supervisory control system operating the wellhead.
• Execution on final Issued Drawings
• Material Management / issuance as per contractor demand.
• Planning of execution of Non destructive tests (RT,UT,DPT,MPI)
• Planning of Sequence of operation that will carry out on during the execution of project.
• Extensive follow up for the execution of project.
• Better understanding regarding the P& ID’s, PFD’s.
Well Head Facilities Project:
• Erection of Dehydration Plant including at Mari Field Daharki Sindh.
• Installation of Wellhead Facilities
• Laying of pipeline gathering system of Deep wells
• Installation of Pig Launcher /Receivers at junction for pigging purposes.
• Installation of Line Heater
• Installation of PCV’s ,FCV’s ,Gas instrument Packages
• Installation of Mobile and separator depending upon the flow of Wells
• Installation of SCADA System
Drilling Projects
Well Koonj-1A (Sukkur Block)
• Monitoring drilling operations in coordination with Chinese contractor
• Prepares updated operations data work order.
• Making of BHA’s Tallies of Drill Pipes & Casing.
• Stick up adjustment of casing while casing hanging (keep in view floor height, cellar depth while adjusting the stick up of the landing joint of casing).
• Able to identify the dull grading of the used drill bits.
• Able to execute the Totco deviation survey to evaluate the deviation of the well, also with the help of self floating deviation tool.
• Cement & additives Calculations to reconfirm with Services Companies.
• Better understanding regarding leak off test, formation integrity test, BOP’s test, well head test ,Bit Hydraulics, Cut & slip drill line.
• Reconfirmation & matching of details written in IADC reports with the actual activities that happened at rig site.
• Noting down exact repair time.
• DESCON Engineering Limited Lahore
Eductation
• University of Engineering & Technology, Lahore Pakistan
Bachelor of Sciences in Mechanical Engineering
[2003-2006]
(4394/5300) (82.9 %)
• Government College University , Lahore
Intermediate (HSSC)
[2001-2002]
(918/1100) (83.4 %)
• Government Central Model School, Lahore
Matric (SSC)
[1998-2000]
(736/850) (86.5 %)
Hot Categories
Chemicals
Batteries