Egypt Zones accountACCOUNT

Process Engineer


This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription. Go to Recruitment Products >>
Education: 4
Experience: 2 years
Relocation: Yes - Internationally

Industry Experience
2 years Process Engineer
0 years

Career Objective

Plant control by by truely planning and managment

Professional Experience

With Colony Sugar & Distilleries Ltd.at their Distillery Plant In the Capacity of Shift Engineer , following sections of the plant are efficiently handled
„« Fermentation:
this section involves
o Dilution of the Sugarcane Molasses.
o Development / Growth of Bacteria (yeast) that is aerobic (biochemical) reaction in nature.
o Anaerobic Fermentation of the Diluted sugar Molasses by using The Yeast and activated mass , developed in Prefermentation section. Here Bacteria convert the Molasses Sugar into Ethanol.
o This section involves control pneumeticaly as well as electronic control with Honeywell DCS.



„« Distillation (Refinary)Section :
With 125000 L/Day capacity of the plant , There are Two main sections,
o Vacuum Distillation units are used to seprate (Distille) Ethanol from Fermented mash and further Ethanol is Rectified under vacuum and while diluting with water to remove Impurities it is also distilled at atm pressure.
o Rectification of Raw Ethanol (95%) is further carried out to remove Fusel Oil , an impurity..
o The section, mainly used as such in Oil Refinaries, involves the use of Various types of Exchangers for Heat Transfer.
o These sections are Controlled pneumeticaly and Electronicaly with Honeywell DCS

„« Ethanol Dehydration (Fuel Ethanol) Unit (Capacity125,000 L/Day)

o Product of Distillation section (96.6%) is further Dehydrated under high temperature and high pressure to produce Fuel Grade Ethanol (99.9%) , by passing the superheat vapours of Ethanol through Molecular Sieves.
o This section also involves pneumetic and electronic control with Honeywell DCS

„« Effluent Treatment Plant (Bio Gas Unit) capacity 65000 M 3 /Day

o At this section BioGas is produced by using the spent waste of distillation unit, this involves biochemical reaction of anaerobic type. Gas produced contains 3-5 psi Pressure (Abs) and 55- 65 % Methane wich is supplied to bioler house

„« Utilities ( Steam Production, cooling towers, Instrument air Compressors and Process air Blowers) are as per requirement of the plant capacity.

Eductation

BSc. Chemical Engineering degree

Certification

Pakistan engineering councel certified

Hot Categories

Chemicals Batteries

Are you Hiring?


Reach the right candidates to fill your technical positions with Gulfoilandgas Jobs »
Technical Recruitment
Our Career Center has 70,000+ resumes for employers to search »
600-Process and Chemical Engineering Consultants » News » Design/construction/Engineering Graphics » News » Engineering » News » Engineering Services » News » Production Engineering » News » Project & Resource Management » News » Training & Education » News »
Engineer
Mechanical Engineer
Field Engineer
Quality Control/Quality Assurance Engineer
Environmental Health & Safety Associate
Engineering
Technician
Electrical Engineer
Engineering
Petroleum

Field Service Technician
Manager
Information Systems/Technology
Electrical/Mechanical/Structural
Construction Engineer
Civil Engineer
Assistant Manager
Purchasing Management
Chemical Engineer
Project Engineer
Analyst
Engineering
Drilling

Customer Service
Process Engineer
Control Engineer
Project Manager
Electrician
Computer Systems Analyst
Engineering Management
Operations Manager
Specialist
Marketing/Sales Manager
Sales
Construction Technician
Mechanic
Plant Engineer
Driller
Consulting Engineer
Maintenance Manager
Other
Egypt Zones
Copyright © Universal Solutions All rights reserved. - Privacy Policy.