electrical supervisor construction/commissioning
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 3
Experience: 10 years
Relocation: Yes - Internationally
Career Objective
OBJECTIVE:
To achieve a technically challenging position in the area of electrical & electronics in which I can utilize 9 years of electrical maintenance and construction skills to contribute to the company’s development and excel in field.
Professional Experience
EXPERINCE DETAILS:
1 GENERATION STATION CONSTRUCTION ACTIVITES SUCH AS Generation station to substation cable laying and substation looping cable laying as per the cable schedule, installation of generation protection equipments such as CT’s, PT’s, temperature, sensors, vibrations and turbine, speed control equipment and all the associated field wiring installation of turbine control panels and synchronizing panel with all the protective parameters set to SEPAM logic.
1 INSTALLATION OF CABLE TRAY CONDUITING FOR THE LIGHTING, INSTALLATION OF POWER PANELS, LIGHING PANELS ETC.
2 FIELD CONSTRUCTION ACTIVITIES Transformer’s erection.Transformers incomer cable glanding and termination with associated cable supports.Bus duct installation on transformers with associated supports.
N E R installation and neutral grounding .installation of transformers protection CTs and PTs, Neutral ct, Temperature sensors, Bucholtz relay and their associated wiring to the marshalling unit.
Eductation
QUALIFICATION:
Technical : Certificate Course For Electrical Engineering (Diploma), India, Karnataka
Academic : Secondary School Leaving (SSLC)
Certification
7 ELECTRICAL SUPERVISOR CONSTRUCTION
1. CONCSOLIDATED COTRACTRS COMPANY (KSA)
2. PROJECT.KHURSANIYAH OIL GAS PROJECT
CLIENT;BECHTEL TECHNIP JV
05 MAY 2007 TO 15 MAY 2008
CCC,SAUDI in association with the BTJV
Substation and ETP construction activities independently also familiar with the NEC standards, ARAMCO construction standards and the safety standards associated with these works.
ResponsibiWorking as an ELECTRICAL CONSTRUCTION SUPERVISOR with theCCC lities construction activities like cable tray installation lighting conduit installation cable laying make the site execution man power allocation and evaluation of work progress preparing day to day inspection schedule testing commissioning of MV & LV distribution system. Preparation of day to day work schedule and coordinate with the consultants for daily inspection.
Additional Information
(current working with HPCL) HINDUSTAN PETROLEUM)
( POSITION: ELECTRICAL SUPERVISOR CONSTRUCTION)
(PROJECT ; LNG )
(COMPANY; L&T)
(JOINING DATE; 12/09/2008 ,TO TIL DATED)
5 SUBSTATION CABLE ROOM INSTALLATION SUCH AS
cable Cable tray support and cable tray installation.Cable laying and dressing through trays.Cable termination and glanding as per the standard cable gland selection.
6 GENERAL SUBSTATION INSTALLATION SUCH AS Earthing grid construction with earth electrodes installation as per the grounding system drawings and providing equipments bounding to all exposed conductive parts as per TN system of the grounding total buildings lighting protection installation.