electrical & instrumentation project engineer
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 10 years
Relocation: Yes - Internationally
Career Objective
Provide Engineering Services with a technological leader in the oil, gas and petrochemical industry.
Professional Experience
Stork Elecon Limited (Nov. 2006 ¡V Mar. 2009)
DSM Complex, Pacific Avenue Extension,
Point Lisas Industrial Estate, Point Lisas.
„I OPERATIONS MANAGER
Fluor/Summit Alliance (Mar. 2005 ¡V Oct. 2006)
PML Building, Pacific Avenue & Caribbean Drive,
Point Lisas Industrial Estate, Point Lisas.
„I E&I ENGINEER (Mar. 2005 ¡V Oct. 2006)
Hilton Trinidad & Conference Center. (Jun. 2004 ¡V Dec. 2004)
Lady Young Road, Port of Spain.
„I ASSISTANT CHIEF ENGINEER
Bechtel International, Inc. (Oct. 2002 ¡V Jun. 2003)
Atlantic LNG Project, Point Fortin.
„I E&I CERTIFICATION ENGINEER
Atlantic LNG Co. of Trinidad and Tobago. (Oct. 2001 ¡V Sep. 2002)
Old Petrotrin Refinery, Point Fortin.
„I INSTRUMENT FIELD ENGINEER
South West Regional Health Authority. (Mar. 2000 ¡V Sep. 2001)
Paradise Pasture, San Fernando.
„I HOSPITAL PLANT ENGINEER
Maintenance, Training and Security Co. Ltd. (Aug. 1999 ¡V Feb. 2000)
Aranguez Plaza, Aranguez.
Bechtel International, Inc. (May 1998 ¡V Mar. 1999)
Atlantic LNG Project, Point Fortin.
„I E & I FIELD ENGINEER
Managed construction activity for electrical, instrumentation and communication systems installation. Specific system responsibilities (other than previously mentioned) included power generation and distribution, loading dock and inlet gas. Provided technical support to resolve field-engineering issues and technical assistance for the final checkout, commissioning and turnover of the plant.
Climate Control Ltd. (Oct. 1994 ¡V Apr. 1998)
Eastern Main Road, Laventille.
„I CONTROLS ENGINEER
Eductation
California State University, Long Beach, California. USA
Electrical Engineering, Bachelor of Science, December 1991
Pasadena City College, Pasadena, California. USA
Associate in Arts, June 1988
Additional Information
„I E&I Subcontractor Project Manager on Phoenix Park Gas Processors Ltd. Phase III Expansion Project, valued at US$2.1M.
„I Spearheaded the development and implementation of the HSE Policy and Management Plan for Stork Elecon Ltd. Doubled the sales income and percentage of successful bids (up to 40%).
„I Designed and implemented a comprehensive predictive and preventative maintenance program at the San Fernando General Hospital (SFGH).
„I Vendor contract management of the DCS, ESD, LAN, Security, UHF/VHF Radio and Telephone Systems for Bechtel Int¡¦l. Project - Atlantic LNG¡¦s Train 1 construction.
Hot Categories
Chemicals
Batteries