QA/QC Inspector
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 5 years
Relocation: Yes - Internationally
Career Objective
To join to company that can utilize my strong sense of responsibility, absolute commitment to work deadlines and positive attitude towards work and fellowmen, to be successful in all of my endeavors.
Professional Experience
Company : Samsung Engineering Construction Corporation
Client : Abu Dhabi Polymers Company Limited ( Borogue 2
Olefins Conversion Unit) P.O. Box 12455, Ruwais, UAE
Period : 23 Sept 2008 up to present
Position : QA / QC Equipment Inspector (static and rotating)
QA/QC Piping Inspector
Company : GAMA INDUSTRY ARABIA LTD.
P.O. Box 319, Jubail Industrial City 31951
Jubail, K.S.A
Client : Tasnee Petrochemicals
( Tasnee Polyethylene (HDPE-LDPE) Project)
P.O. Box 319, Jubail Industrial City 31951
Jubail K.S.A
Period : 28 May 2007 to 05 June 2008
Position : QA / QC Equipment Inspector (static and rotating)
QA/QC Piping Inspector
Company : Atlantic Gulf and Pacific Company of Manila, Inc.
San Roque, Bauan, Batangas, Philippines
Duties and Responsibilities (QA/QC Equipment Inspector)
„X Conduct actual inspection of materials, equipments to conform to reference standard and specification.
„X Maintain record of the following documents, client specifications, drawings, and special process qualifications subjected for client review and verification.
„X Familiarize with construction and erection drawing, applicable codes and specifications.
„X Carry out inspection ensuring all activities have been properly performed in accordance with approved Inspection Test Plan(ITP), clients specification an applicable standard codes.
„X Prepare request for inspection (RFI) after all erection and installation are complete and inspected accordance with required location, orientation, verticality/horizontality, and elevation.
„X Prepare reports containing the information of actual against requirements.
„X Joint final inspection with all parties in every equipment ensuring the following check points/ checklist location, orientation, verticality/horizontality, internal, external visual, alignment, distance between shaft ends (DBSE) are in approved tolerances.
„X Prepare final closure certificate and signed by all parties.
„X Attend weekly meeting about quality matters.
Eductation
Graduated a degree course BS Mechanical Engineering at Golden Gate Colleges on2 March 200
Hot Categories
Chemicals
Batteries