ORASCOM CONSTRUCTION INDUSTRIES "OCI":
- Project : Borg El Arab International Airport.
- Duties : QA/ QC Engineer, For:-
- W.P.S and P.Q.R Required.
- Fire fighting system Equipment and Piping.
- Child water system Piping and Equipment.
- shear stud welding.
- Duration: Dec 2008 till Now.
ORASCOM CONSTRUCTION INDUSTRIES "OCI":
- Project : "EBIC" Egypt Basic Industries Company.
- Duties : QA / QC Engineer , For:-
- W.P.S and P.Q.R Required.
- Supervision for Equipment Welding ,
1- Package Boiler.
2- Primary and secondary reformer by all special material included.
3- Compressor system welding, and rotary equipment modification.
- Rotary equipment Alignment And installation.
- Static Equipment Installation with internal and catalyst loading.
Duration: January 2007 till Dec 2008.
Power Jet Company:
- Project : Head Office.
- Duties : Sales Engineer.
- Duration: July 2006 till Jan 2007.
ORASCOM CONSTRUCTION INDUSTRIES "OCI":" Training"
- Project : EAST PORT SAID Power Plant (SGPP).
- Duties : 01- Test Package Preparation.
02- Make a clarification/deviation list of documents.
03- Preparation of piping material specification.
04- Preparation of piping material requisitions.
05- Follow up the Welding Map for Piping System.
06- Follow up the Fabrication & Erection for Pipe Supports.
07- Follow up the Modification of Piping & Piping Support.
08- Follow up Punch List of Piping System
09- Assist for preparing End of Erection Report.
10- AUTOCAD Draftman.
Duration: Jun 2002 till Sept 2002
Egypt Gas Company:
- Project : Erection of gas network in Alexandria Egypt.
- Duties : - Training on:-
- Technical activity.
- Erection procedure.
Duration: Aug 2004 till Aug 2004
Eductation
- Mechatronics Engineer.
- Diploma of "IWE" International welding engineer.
Certification
- Primavera P3.
- Inspector level II from ASNT for VT,PT and UT.
- ICDL.
- Time mangement Course.
- Lead auditor for Iso 9001:2000 from IRCA.