Upstream Consultant - Integrated Field Study
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 5
Experience: 9 years
Relocation: Yes - Internationally
Career Objective
To contribute greatly to various solutions of existent chalanges in Upstream mission areas (production encrease, cost reduction, integrity@safety, etc.)
Professional Experience
Jan 2009 – present OJSC TNK-BP Management, Russia
Optimization Engineer, Wellwork Department, Upstream Technology
• Optimize Financial performance of existing production infrastructure through:
- Minimization of losses
- Enhanced “Nodal analysis”
- Reduced dP in system “Bottom hole - Separator”
- Introduction of new technology
• Well Level Optimization through:
- Artificial Lift Design & follow up
- Well Performance analysis
- Real time optimization
• Surveillance System Enhancement via:
- SCADA system upgrade
- Optimizing usage of downhole sensors
- Additional sensors in key node points,
- Field operations follow up
Feb 2005 – Jan 2009 OJSC TNK-BP Management, Russia
PLM Chief Specialist, Reservoir Management Department, Upstream Technology
• Enhancement of Production Performance through Practical Implementation of the Production Loss Management (PLM) Aspects
• Optimization of the existent workflows and schedule for Operations Excellence and Maintenance Groups
• Delivery of proactive Loss Mitigation Activities
• Leading of Multidisciplinary Group
• Completed Assessment of the Performance Unit Capacities and chokes in 4 main areas: Reservoir, Wells, Plant, Export
• Implementation of Root Cause Failure Analysis (RCFA) Expertise
• Administrative support through Expert Group Sessions and Peer Reviews
Achievements:
• 492 actions were proposed, 245 actions were executed with accumulated flow rate 351 topd.
• Main groups of actions:
- preventive workovers due to wear of downhole equipment;
- wellworks at underperforming wells due to skin factor;
- selection of optimum modes of operations of well equipment (including surface equipment);
- scaling and wax inhibitions;
- injection control via surface infrastructure.
• Accumulated result of delivered actions equals to 36 K tons ~ USD 13,5 MM (at USD 50 per bbl.)
Sep 2003- Feb 2005 JSC Yukos, Tomskneft, Russia
Head of Surface Facilities Department, Chief Geologist Group
• Estimation of Surface Facility “bottlenecks”
• Simulation of Pipeline Network Models for Pressure Drop Analysis
• Support and implementation of Energy Saving Program
• Endorsement of Well Intervention Program from the point of Surface Facility Production Limit
Eductation
2001 - 2002 Edinburgh, Scotland Òomsk, Russia Heriot-Watt University, Tomsk Polytechnic University Postgraduate Diploma in Petroleum Engineering
2001 – 2002 Tomsk, Russia Tomsk Polytechnic University Diploma in Professional Re-training of Petroleum Engineers
1992-1998 Tomsk, Russia Tomsk Polytechnic University Postgraduate Diploma in Petroleum Engineering
1992 - 1996 Tomsk, Russia Tomsk Polytechnic University Russian - American Centre Bachelor’s Degree in Management
Certification
Certified Petroleum Engineer
Additional Information
Personal Characterization:
Goal-Oriented, Mobile, Team Player, Communicative, Ready for Innovations, Analytical thinking
Other Activities:
Sport, Science Reading, Computers.
Hot Categories
Chemicals
Batteries