Egypt Zones accountACCOUNT

Oil & Gas Recruitment


This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription. Go to Recruitment Products >>
Education: 4
Experience: 7 years
Relocation: Yes - Internationally

Industry Experience
7 years Other

Career Objective

To work in a field where my distinctive abilities, and skills in people management, planning, time management, organizing, communication, and my hard work, as well as my computer knowledge, could be best utilized.

Professional Experience


Al Mansoori Wire Line services
Current Job From 10-2005
Assistant operator

Worked at Off-shore and On-shore on Oil and Gas wells (Wire Line dIvision)
- Iran : Saga-01 – shahid Ragae Rig – POGC
- UAE : ToTal Abk – Adma OPCO
- Bangladesh : Neiko – Tollow



Middle East Operation & Maintenance For Oil Refineries
MIDOR
From 06-2002 to 10-2005

Crude oil Distillation Unit, Vacuum Unit & Debutanizer Operator


Scope & Responsibilities

• Collecting and taking samples for the following products:
- Naphtha
- kerosene
- Light Diesel
- Heavy Diesel
- Atmospheric Residue
- Light Vacuum Gas oil
- Heavy vacuum Gas oil
- Vacuum residue
- Crude oil
- Desallter inlet & outlet for water and crude oil.
- water PH.
- LPG samples. (Cylinder)
- Off gas samples. (Cylinder)
- H2S samples. ( Balloon)
• Chemical injection for the following :
- - Flimming Amine
- - Corrosion Inhibitor


• Dealing with the following Equipments :
- - separating Vessels
- - Fractionators Towers
- - Heaters
- - Desallter
- - Pumps
- - Heat exchangers…
- -(Fixed head – float head – U Tube)
- - Air coolers
- - Boiler
- - Compressor
- - Control valves…
- - (pressure – temperature – level and flow)
• Collecting and taking samples for the following products:
- Naphtha
- kerosene
- Atmospheric Residue
- Light Vacuum Gas oil
- Heavy vacuum Gas oil
- Vacuum residue
- Crude oil
- Desallter inlet & outlet for water and crude oil.
- water PH.
- LPG samples. (Cylinder)
- Off gas samples. (Cylinder)
- H2S samples. ( Balloon)
• Chemical injection for the following :
- - Flimming Amine
- - Corrosion Inhibitor
- - Demulsfire
- - Caustic soda
- - Phosphate
• Dealing with the following Equipments :
- - separating Vessels
- - Fractionators Towers
- - Heaters
- - Desallter
- - Pumps
- - Heat exchangers…
- -(Fixed head – float head – U Tube)
- - Air coolers
- - Boiler
- - Compressor
- -(pressure – temperature – level and flow)
• Control panel:
- Used to use DCS
- Distribution Control system) FoxPro
- Used to receive the Crude Oil from storage tanks and transfer products from the unit to
- Storage tanks or to the treatment units, and switch from tank to tank.

Eductation

Education
• 6th of October University ( Bachelors Degree in Deutsch & Spanish Language)
Faculty of Languages and translation
• AL-Ruwais Languages School (Abu Dhabi)

Hot Categories

Chemicals Batteries

Are you Hiring?


Reach the right candidates to fill your technical positions with Gulfoilandgas Jobs »
Technical Recruitment
Our Career Center has 70,000+ resumes for employers to search »
Associations » News » Event Organizers » News » Freight Forwarding » News » Professional Services » News » Recruitment » News » Sourcing & Procurement » News »
Engineer
Mechanical Engineer
Field Engineer
Quality Control/Quality Assurance Engineer
Environmental Health & Safety Associate
Engineering
Technician
Electrical Engineer
Engineering
Petroleum

Field Service Technician
Manager
Information Systems/Technology
Electrical/Mechanical/Structural
Construction Engineer
Civil Engineer
Assistant Manager
Purchasing Management
Chemical Engineer
Project Engineer
Analyst
Engineering
Drilling

Customer Service
Process Engineer
Control Engineer
Project Manager
Electrician
Computer Systems Analyst
Engineering Management
Operations Manager
Specialist
Marketing/Sales Manager
Sales
Construction Technician
Mechanic
Plant Engineer
Driller
Consulting Engineer
Maintenance Manager
Other
Egypt Zones
Copyright © Universal Solutions All rights reserved. - Privacy Policy.