I'm a Production Control Engineer at Daikin Industries (Thailand) LTD.,Chonburi.
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 4 years
Relocation: Yes - Internationally
Career Objective
Production planning and control of Room Air-Conditioning Outdoor Assembly line .
Professional Experience
: Control production of Room Air-Conditioning Outdoor Assembly line and Branch Provider line.
: Balance monthly , weekly , daily plan and make priority plan .
: Control production result base on daily plan and monthly plan both model and quantity.
: Calculate working time and shift operation in each month.
: Support shipment schedule and rework.
: Set rework meeting to find the countermeasure with all Division concern.
: Follow up new part apply in each month,which developed change by Design Division.
: Manage the obsolete and dead stock part ,find countermeasure for make it have more useful.
: Contact with affliate about forecast plan and their demand in each month .
Eductation
2000-2005 : Bachelor's Degree Industrail Engineering (4th),Kasetsart University at Sriracha .
1996-1999 : High School, Suankularb Wittayalai Nonthaburi.
1993-1995 : Secondary School, Amporn Paisarn School(Nonthaburi) .
1988-1992 : Primary School, Sahavit School(Suphanburi).
Certification
June 2007-June 2008 : Representator of Joint Welfare Consultation Committee 2007 in Daikin Industries (Thailand) Ltd .
June 2008 : Training course Production of Daikin System ( apply from TPS )
January 2005 : Training course for Production Management Plan.
May 2005 : Training course TPS System (Toyota Production System) by TCC(Toyota Co-orperation Club)
April 2002 : Trainee at Robert Bosch, in Security System (CCTV,Smoke detecter)
April 2002 : Study in German language course.
September 2001: Training Auto Cad & Solid Work.
Additional Information
Extra skill : Knownledge on TPS(Toyota Production System) or LEAN Production .
: Knownledge on pull production system ,command the production by Kanban System .
: Cost down system such as Milk Run Project , Value Analysis .
: Incoming On-Time Outgoing On-Time concern.
: Continuous improvement or KAIZEN concern.
: Make production plan and balance plan by use SAP program.
Hot Categories
Chemicals
Batteries