projects engineer
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 4
Experience: 19 years
Relocation: Yes - Internationally
Career Objective
Power Station Project Engineer.
Prepare the IFB. Evaluate the Bidders,
Monitoring & Follow up all phases of the project [Design, Engineering, Manufacturing, Shop Test, Erection, Commission, Start up, Punch List ,TOAC and Warranty .
Professional Experience
Medium & Low voltage Installation Engineer , responsible for pulling cables for medium and low voltage transmission lines (Towers ,Transformers ).
Mansoura Electrical Contracting Co.
Egypt.
07/90 - 10/91 :
Supervisor and as Built Engineer, responsible for supervising and complying the Design Drawings for the Shobra Elkhema Telephone Project (40,000 lines) .
Under Consultancy and Supervision of Siemens Germany.
Egyptian Army.
Egypt.
02/92 - 06/94 :
Maintenance & Installation Engineer, responsible for Execution , Maintaining and Controlling the Electrical Procurement , Managing the Electrical works Reporting to GM for Plastic Production Machines.
Shoman Plastic Production Machines Manufacturing. New Damitta,
Egypt.
06/94 - 12/00 :
Maintenance & Installation Engineer, responsible for Electrical maintenance for the existing lines , study the technical offers , follow up the technical requirements and specifications ,determine and design the electrical requirements for the new extension for the Food Industry Plant,
• Ice Cream & Juice plant.
• Food Processing , Filling and Packing factory.
• Under construction Medicine factory.
• Cosmetics factory.
Under Danish management and Supervision.
Batterjee Group for Trade and Industry, Jeddah ,
Saudi Arabia.
01/01 - 07/ 02:
Regional Representative for Valve and Water Projects Accessories manufacturing company. Responsible for representing the company in Egypt including introducing the company to market (Contractors and Consultants ),evaluating the market and market share, studying and bedding for the undergoing projects and submit the product technical data. For AVK Valves company, Denmark, Egypt.
07/02 - 11/04 :
Operation shift engineer for 300 MW Gas Combined Cycle power plant responsible for : operate , supervise , report to the maintenance dept, the operation head, for operation duty and handling the units behavior reports.
East Delta Electricity Production co. Mansoura ,
Egypt.
11/04 - now :
Power Station Project Engineer. responsible for participate in complying:-
Prepare the PDR .Prepare the IFB. Evaluate the Bidders, Negotiate &Contract Award.
Monitoring & Follow up all phases of the project [Design, Engineering, Manufacturing, Shop Test, Erection, Commission, Start up, Punch List ,TOAC and Warranty .
Eductation
B.Sc. of Engineering - Electrical Power and Machines Dept.
Certification
ready to submit upon request
Hot Categories
Chemicals
Batteries