Egypt Zones accountACCOUNT

Planning Engineer/ Scheduler/ Mechanical Engineer


This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription. Go to Recruitment Products >>
Education: 4
Experience: 1 years
Relocation: Yes - Internationally

Industry Experience
1 years Mechanical Engineer
1 years Mechanical Engineer

Career Objective

To work in a challenging environment that would help me thrive and enhance my knowledge and skills by effectively utilizing the strong background I possess in the field.

Professional Experience

1. Position: Scheduling Engineer
Employer: Al - Robaya Establishment For Contracting
ABQAIQ 31992,
P.O.BOX 66,
K.S.A.
Projects:
• Qurriyah Pipeline Rehabilitation 9.30 to 18 km,
• HRDH-1065,1025 Tie In & HWYH-992 Wellhead, Flowline & Communication
• HAWIYAH & NORTH HARADH GAS MANIFOLDS EXPANSION
Duration: January‘09 - Till date
Duties and Responsibilities:
• Preparation of detailed Schedule from Break Order Quantities
• Updating the progress in the program.
• Generation of Various Reports for Clients, Consultants, Managers, etc
• Preparation of weekly progress report
• Attending weekly site meetings

2. Position: Assistant Engineer
Employer: BHARATI SHIPYARD Ltd
MIRYA BUNDER,
RATNAGIRI – 415612,
MAHARASHTRA.
Projects: V-323 (Reliance tug vessel),
V-352, V-353 (Bourbon Arethuse tug vessel)
Duration: March ‘ 08 – December ‘08
Duties and Responsibilities:
• Quality surveillance, Welding Inspection, Documentation & Dimensional Check. & Interpretation
• Review fabrication/Erection, documents and work quality in terms of specification, workmanship and other variables as indicated in the above-mentioned documents as per requirements of QC standard operating procedure and client’s specification
• Ensuring workshop personnel are working to the correct procedure and process
• Co-ordination with company & subcontractors.
• Review/monitoring the approved quality and inspection plan.
• Witnessing pneumatic testing of piping, tanks and equipment.
• Perform line checking/prepare and check official test pack prior to release for pneumatic testing by ensuring that all welding inspection and NDT activities affecting the quality of welds contained in each frames have been completed and accepted.
• Witnessing all Hold points for Pneumatic and Hydro Testing etc.
• At fabrication - stage wise inspection for fabrication activities, fit-up, weld visual inspection as per standard.
• Monitoring and supervising the total construction activities.
• Involved for the coordination of different department for the preparation of tender document, specification preparations, technical proposal submittal etc.

Eductation


LBS College Of Engineering
2004-2008 Bachelors Of Technology (Mechanical)
67 %


St Josephs Boys Higher Secondary School
2002-2004
Higher Secondary Education
75 %
Hill Top Public School
2002 CBSE
69 %

Certification

Primavera P6 , Microsoft Project Management 2003

Additional Information

PROJECTS:
Course Projects
1. A “Improvisation of dry dock frontage dredging system" with reference to Cochin Port Trust. Designed a pontoon with a rotating boom to hoist the cutter section dredging pump
2. Design of high efficiency scooter using hybrid technology. Implanted electric motor into a two stroke scooter to increase its mileage

Presentation
Wear Debris Analysis. It helps to identify exact nature of the machine problem, where it occurs and forecast expected breakdown


OTHER ACHIEVEMENTS:

1. Has undergone a short term course on ‘Marine Diesel Engines & Auxiliaries’ with reference to CIFNET(Central Institute of Fisheries And Nautical Engineering Training)
2. Has participated in the workshop on MEMS(Micro Electro Mechanical Systems) conducted by Dept of Mechanical Engg, LBSCE

INDUSTRIAL VISITS:

• Visited Mangalore Refineries and Petrochemicals Ltd., Mangalore
• Visited Chemicons, Mangalore
• Visited GKN Sinter metals Ltd , Pune
• Visited COMEEX Machine Tools Company, Pune
• Visited Kirloskar Pneumatics, Pune

SKILLS/ STRENGTH:

• Hardworking with a positive attitude
• Strong sense of responsibility and self motivation
• Ability to work well, independently and as a member of team
• Ability to work under pressure to meet schedule deadlines


Hot Categories

Chemicals Batteries

Are you Hiring?


Reach the right candidates to fill your technical positions with Gulfoilandgas Jobs »
Technical Recruitment
Our Career Center has 70,000+ resumes for employers to search »
200-Engineering Consultants » News » Design/construction/Engineering Graphics » News » Engineering » News » Engineering Services » News » Production Engineering » News » Project & Resource Management » News » Training & Education » News »
Engineer
Mechanical Engineer
Field Engineer
Quality Control/Quality Assurance Engineer
Environmental Health & Safety Associate
Engineering
Technician
Electrical Engineer
Engineering
Petroleum

Field Service Technician
Manager
Information Systems/Technology
Electrical/Mechanical/Structural
Construction Engineer
Civil Engineer
Assistant Manager
Purchasing Management
Chemical Engineer
Project Engineer
Analyst
Engineering
Drilling

Customer Service
Process Engineer
Control Engineer
Project Manager
Electrician
Computer Systems Analyst
Engineering Management
Operations Manager
Specialist
Marketing/Sales Manager
Sales
Construction Technician
Mechanic
Plant Engineer
Driller
Consulting Engineer
Maintenance Manager
Other
Egypt Zones
Copyright © Universal Solutions All rights reserved. - Privacy Policy.