driller
This is a candidate registered on Gulfoilandgas.com. To contact this candidate you need to purchase a subscription.
Education: 3
Experience: 10 years
Relocation: Yes - Internationally
Industry Experience |
9 years |
|
Driller |
9 years |
|
|
Career Objective
to work as driller on shore and off shore
Professional Experience
Professional Experience
1-DEC 2008 TO DATE
KCA DEUTAG DRILLING GMBH LIBYA
DRILLER
Working with KCA DEUTAG Rig T202 TDS 3000HP Draw works( ideco ) contractor for SHELL LIBYA in RASHDA A#1 NC 214 TD of well 21000ft.There are complexHPHT wells with extreme well control,Mud losses ,pipe stuck problems.
2-Dec 2005 ¨C DEC 2008
Schlumberger Drilling Services, Pakistan
Driller
Responsibilities / Accomplishments:
Presently working as Driller with Schlumberger on Rig-23 contractor for Pakistan OilFields Ltd. (POL) in Pindori Field. I have Drilled Pindori # 6 & Water Injector-2A. TD for the wells are about 14,000 ft. These are complex HPHT wells with extreme Well Control, Mud Losses and Pipe Stuck Problems.
I have also worked on Schlumberger Rig-60 for about 2 months as Driller. It was 1200 HP (IDECO 1200) Rig with Varco 400 ton Top-Drive (VARCO-9S).
Rig Description: Gardner Denver-2100E Kelly Driven, Pyramid Mast & 550 ton Traveling Block, 2 x Gardner Denver PZ-11 Mud Pumps, 1800 bbl Mud Tanks, 21-3/4¡å 2k & 13-3/8¡å BOP Stacks.
Feb 2005 ¨C Dec 2005
Schlumberger Drilling Services, Pakistan
Assistant Driller
Responsibilities / Accomplishments:
Joined Schlumberger as Assistant Driller on Pindori # 6. Based on performance I was promoted to Driller while working on same well.
Rig Description: Same as above
Jul 2001 ¨C Feb 2005 Oil & Gas Development Company Ltd (OGDCL), Pakistan
Assistant Driller
Responsibilities / Accomplishments:
Worked with OGDCL Pakistan for drilling of 4 wells around 15,000 ft. depth in different areas of Pakistan.
Rig Description: Rig Description: National 2000 HP Rig (1320 UE Electrical Drawworks), Kelly Driven, 2 x 1600 HP National Mud Pumps (12-P-160), 2000 bbl Mud System and 13-5/8¡å 5k BOP Stack (Shaffer Annular + Cameron Double Ram & Single Ram).
Sept 1999 ¨C July 2001 Kot Addu Power Company Ltd. (KAPCO), Pakistan
Technician ( Electrical)
Responsibilities / Accomplishments:
Started career as Electrician in Gas Turbine Power Station (1600 MW).
Eductation
Educational Qualification
DAE (Diploma of Associate Engineer) in Electrical Technology from Board of Technical Education Lahore (PAKISTAN)
B.A (Eco) Bahauddin Zakriya University Multan
Certification
IWCF Certification
IWCF Well Control Certification (Driller Level): Attended and Passed from RANDY SMITH Cairo, Egypt from 23rd March to 27th March 2008. Validity: 28th March 2010
Additional Information
Professional Training / Courses
Over View of Petroleum Industry
Introduction To Rig and its components
Basic Geology
Basic Rig Crew Safety
H2S alive
Assistant Driller Plant
Assistant Driller Operation
Computer ( Windows, Ms Office)
Fishing Technology
Blow Out Prevention First Line
Computer (Windows, Internet )
BHA Designing
Assistant Driller Operation (Revised)
Basic Drilling Technology
Drilling Practices: Serial No. 1 to 15 by Oil & Gas Company Ltd. (OGDCL)
First Aid Level 1
Hazard Identification Level 1 & 2
Vehicle Passenger
Circadian Rhythm Level 1
Environment Level 1
Fire Safety Level 1
Hazardous Materials Level 1
Lock-Out Tag-Out Level 1
Mechanical Lifting Level 1
Noise/Nuisance Level 1
Permit To Work Level 1
PPE Level 1
Pressure Level 1
QHSE Level 1 & 2
Substance Abuse Level 1
Workshop Safety Level 1
Discrimination & Harassment Level 1
Intellectual Property Level 1: Serial No. 16 to 33 by Schlumberger
Hot Categories
Chemicals
Batteries